Financial Snapshot (Indicative)
Figures are indicative and based on information provided by the listing source. They are not a full investment appraisal.
This UncommonDeal report analyses 11 Parkstone Road, Walthamstow, London, E17 3JA as a 3 bedroom mid-terrace freehold auction opportunity. The focus is on flip profitability, buy-to-let cashflow, BRRR feasibility, and bid caps that protect a target net profit range of £40,000 to £150,000 after costs, using a bridging assumption of 0.9% per month across 6, 9, and 12 month exit timelines.
| Property address | 11 Parkstone Road, Walthmastow, London, E17 3JA |
| Type of property | 3 bedroom mid-terrace house, Freehold |
| Auction date | 4 March 2026, 2:00pm |
| Auction starting bid / guide price | £350,000 (check auction whebsite for any change in starting / guide price) |
| Auction website page link | View on Auction House London |
| Admin cost visible on listing | Administration charge: £1,800 incl VAT (buyer should check the auction pack/addendum for any other costs relevant to this property) |
| Number of rooms | 3 bedrooms |
| Article 4 area | Yes |
Vacant 3 bedroom mid-terrace house arranged over ground and first floors. Internally the layout includes two reception spaces with an open-plan kitchen area, a ground floor bathroom, and three bedrooms upstairs. Externally there is a rear garden. The setting is residential Walthamstow with access to local amenities and rail links via Wood Street Overground.
Planning permission and permitted development rules for this property fall under the local authority. Buyers should review the relevant planning guidance on the
local council planning portal
before relying on any extension, change of use, or development assumptions.
| Comparable | Sold price | Sold date | Notes |
|---|---|---|---|
| 83 Turner Road, London, E17 3JG | £905,000 | Aug 2025 | Loft conversion, 4 bedrooms |
| 18 Woodlands Road, London, E17 3LE | £735,000 | Sep 2025 | Strong mid-band reference |
| 54 Woodlands Road, London, E17 3LE | £856,000 | Jan 2025 | Upper band reference |
| 17 Corbett Road, London, E17 3JY | £665,000 | Mar 2025 | Lower band reference |
| 35 Corbett Road, London, E17 3JY | £720,000 | Feb 2025 | Mid band reference |
Recently listed / under offer (within 0.25 mile radius)
- Waverley Road, Walthamstow: £800,000 (Sold STC)
- Corbett Road, Walthamstow: £725,000 (Sold STC)
- Woodlands Road, Walthamstow: £825,000 (Sold STC)
Recently listed for let (similar size and rooms)
- Fulbourne Road, Walthamstow, E17: £2,100 pcm (Let agreed)
- Garner Road, Walthamstow: £2,295 pcm (Let agreed)
- Hale End Road, Walthamstow, E17: £2,500 pcm
| Assumption | Value used | Notes |
|---|---|---|
| GDV Scenario A (Min) | £650,000 | Anchored to lower sold band references and conservative finish assumption |
| GDV Scenario B (Mid) | £725,000 | Anchored to mid-band sold references and sold STC guide levels |
| GDV Scenario C (Max) | £800,000 | Requires strong finish and buyer demand, closer to upper band evidence available |
| Refurb stress tests | Minimum £70,000 | Medium £95,000 | Maximum £125,000 | Full modernisation range with contingency. Legal pack flags heating and compliance uncertainty |
| Bridging (auction) | 0.9% per month, 6 / 9 / 12 month exits | Used because it is an auction lot. Actual terms depend on lender, valuation, and condition |
| Buyer costs allowance | Auction admin £1,800 incl VAT + legal/survey/insurances allowance | Buyer should check auction pack for any additional fee lines or special conditions |
| Selling costs allowance (flip) | Agent + legals + marketing allowance included | Assumed to keep net profit realistic after exit |
| Tax | Investor SDLT bands assumed | Confirm SDLT with your solicitor/accountant for your ownership structure |
| GDV scenario | Refurb stress | Exit timeline | Max bid for ≥ £150k net | Max bid for ≥ £40k net | Investor read |
|---|---|---|---|---|---|
| A (Min) £650k | Max £125k | 12 months | £299k | £390k | This is the safety rail cap |
| B (Mid) £725k | Med £95k | 9 months | £432k | £535k | Comfortable headroom vs guide |
| C (Max) £800k | Min £70k | 6 months | £611k | £706k | Only if finish and demand justify it |
Absolute walk-away cap: £424,000 (Scenario A Min GDV, Max refurb, 12 months, approximately breakeven after costs)
- Re-check addendum and special conditions on the day (fees, completion deadlines, extra disbursements).
- Confirm bridging offer is aligned to auction completion timelines and property condition.
- View the property (or instruct a viewing) and sanity-check structural condition before bidding.
- Solicitor instructed pre-auction, ready to exchange and complete within auction timelines.
- Hard Stop Rule: If bidding approaches the hard stop cap, stop bidding. No exceptions.
Net flip profit below is modelled after typical costs, refurb, investor SDLT allowance, auction admin, bridging at 0.9% per month, and selling costs allowance. Use it to compare bid discipline versus timeline and refurb risk.
Scenario B (Mid GDV £725k) as the primary lens
| Refurb | Exit | Bid £330k | Bid £350k | Bid £370k |
|---|---|---|---|---|
| Min £70k | 6 months | £278,410 | £255,150 | £231,890 |
| Min £70k | 9 months | £270,827 | £247,062 | £223,297 |
| Min £70k | 12 months | £263,245 | £239,975 | £216,705 |
| Med £95k | 6 months | £253,410 | £230,150 | £206,890 |
| Med £95k | 9 months | £245,827 | £222,062 | £198,297 |
| Med £95k | 12 months | £238,245 | £214,975 | £191,705 |
| Max £125k | 6 months | £223,410 | £200,150 | £176,890 |
| Max £125k | 9 months | £215,827 | £192,062 | £168,297 |
| Max £125k | 12 months | £208,245 | £184,975 | £161,705 |
| Scenario | GDV | Max bid for ≥ £150k net (6 / 9 / 12) | Max bid for ≥ £40k net (6 / 9 / 12) | Refurb basis |
|---|---|---|---|---|
| A (Min) | £650,000 | £311k / £305k / £299k | £405k / £398k / £390k | Max refurb £125k |
| B (Mid) | £725,000 | £440k / £432k / £424k | £544k / £535k / £527k | Med refurb £95k |
| C (Max) | £800,000 | £611k / £601k / £591k | £706k / £696k / £686k | Min refurb £70k |
- Conservative: Use Scenario A + Max refurb + 12 months as your cap discipline model.
- Core: Use Scenario B + Med refurb + 9 months as your realistic core case.
- Optimistic: Use Scenario C only if your refurb spec, buyer pool, and timeline support the premium GDV.
- Minimum (£70k): Mostly cosmetic plus targeted upgrades, no major surprises.
- Medium (£95k): Full modernisation with services upgrades.
- Maximum (£125k): Deeper scope with contingencies, compliance fixes, and unknowns priced in.
| Assumed GDV | Exit | Bid | Refurb | Net flip profit (£) | Signal |
|---|---|---|---|---|---|
| £650k (Min) | 12 months | £370k | £125k | £65,005 | Viable, tight lane |
| £725k (Mid) | 9 months | £350k | £95k | £222,062 | Strong |
| £800k (Max) | 6 months | £350k | £70k | £330,610 | Very strong if achievable |
- The flip model benefits from strong local comparables and a solid buyer pool.
- Bid discipline should be anchored to Scenario A with Max refurb as the cap rail.
- Legal pack flags (heating, electrics evidence, special conditions) should be priced into the refurb and timeline assumptions.
Buy-to-let (cashflow reality + stress test)
Walthamstow often behaves like a capital growth market. Rents can be strong, but high purchase values can compress yield. Use a stress mindset: if interest rates rise and rent softens, cashflow buffers matter.
| BTL lens | Rent reference | Debt stance | Stress test | Outcome |
|---|---|---|---|---|
| Lower leverage hold | £2,100 to £2,500 pcm range | Lower LTV improves resilience | Rent -10% and rate +1.5% | More likely to remain workable |
| High leverage hold | £2,100 to £2,500 pcm range | Higher LTV can compress cashflow | Rent -10% and rate +1.5% | Higher risk of negative cashflow |
BRRR (feasibility check)
- BRRR is usually constrained in higher-value London areas because rent does not always support a large refinance at high GDV.
- Practical outcome: BRRR may still work, but often as a partial recycle (you leave equity in) rather than a full cash-out recycle.
- Article 4 is a planning constraint if your BRRR angle relies on HMO conversion, which typically requires planning permission.
For more information on the Legal pack, view the legal pack section.
Documents reviewed (attached)
| Section | Document | Key investor impact | Headline risk |
|---|---|---|---|
| Title | Official Copy of Register of Title (EGL358846) | Restriction tied to lender charge, covenants, and registration requirements | High |
| Title | Title Plan (EGL358846) | Boundary clarity impacts access, works, and extension assumptions | Medium |
| Auction contract | Special Conditions of Sale | Completion trap risk and buyer cost exposure | High |
| Seller disclosures | TA6 Property Information Form | Condition flags and missing compliance evidence | Critical |
| Seller disclosures | TA10 Fittings and Contents | Handover expectations and refurb scope clarity | Low |
| Searches | Water and Drainage report | Public sewer within boundary can restrict extension plans | High |
| Searches | Local Authority search (regulated personal search) | Article 4 constraints impact HMO/change-of-use assumptions | High |
| Energy | EPC | Baseline compliance signal for lettings | Low |
Risk table (what to check before auction)
| Risk | Where it appears | Why it matters | Investor action | Severity |
|---|---|---|---|---|
| Central heating not in good working order | TA6 | Cost uplift, potential delays, lender surveyor concerns | Assume repair/replacement until proven. Price it into refurb and timeline | Critical |
| Electric compliance uncertainty (certificates to follow) | TA6 | Mortgage/insurance friction, remedial works risk | Assume new EICR and budget remedials | High |
| Title restriction linked to lender charge (registration requires compliance) | Title register | If not discharged properly, registration/refi/sale timelines can be impacted | Solicitor to confirm discharge evidence and completion mechanics | High |
| Restrictive covenants (historic schedule) | Title register | May constrain certain uses or works depending on enforceability | Solicitor to advise on enforceability and your intended works | Medium |
| Public sewer within boundary | Water and drainage | Can restrict extensions, require build-over consent, add cost and delay | If your GDV relies on extension, confirm feasibility first | High |
| Special Conditions completion pressure (notice to complete risk) | Special Conditions | Delays can become expensive quickly | Bid only with funding certainty and solicitor ready pre-auction | High |
| Article 4 constraints | Local authority search | Planning route needed for certain conversions (including HMO angle) | Do not assume permitted development for change-of-use | High |
Kill test legal pack checklist
| Kill test | Pass condition | If it fails | Action |
|---|---|---|---|
| Charge discharge and restriction compliance | Solicitor confirms clean discharge evidence on completion | Registration and refinance risk | Walk away or reduce bid to reflect risk and delay |
| Heating failure priced and planned | Repair/replacement scope and cost allowed | Refurb overrun and voids risk | Increase refurb stress or reduce max bid |
| Electrical compliance route | Certs appear or you budget EICR and remedials | Mortgage/insurance friction | Treat as cost, not a hope |
| Extension plan survives sewer constraint | Build-over feasibility understood | GDV upside compromised | Rebase GDV to Scenario A or walk away |
| Special Conditions completion timeline | Funding and solicitor timeline is realistic | Penalty costs and forced completion pressure | Bid only if ready. Otherwise, walk away |
At the £350,000 guide, this sits inside the hard stop cap (£390,000). If your solicitor is satisfied with the title discharge mechanics and you price the heating/electrics uncertainty into refurb, the flip numbers remain robust.
Disclaimer: Decision support only, not legal/financial advice. Buyers should view the property and make sure they are satisfied structurally before bidding. Always have your solicitor confirm covenants, auction conditions, and any special conditions before bidding. Buyer should check the auction pack/addendum for any other cost that may be relevant to this property.
Analysis date: 17 February 2026. Viewers should check for any new updates on the auctioneer website.
Legal Pack Analysed (Investor Preview)
This is not a summary.
This is a buyer-grade legal risk review.
Every auction and sourced deal comes with a legal pack.
Most investors either skim it… or ignore it entirely.
That’s where expensive mistakes happen.
Below analysis breaks down the actual risks, restrictions, and hidden clauses inside the legal pack that directly affect:
- Whether you can finance the deal
- Whether your exit works
- Whether the numbers you ran are even valid
Property
11 Parkstone Road, London, E17 3JA
Documents reviewed (as provided)
| Section | Document | What it is | Why investors should care |
|---|---|---|---|
| Title | Official Copy of Register of Title (EGL358846) | Freehold title register, restrictions, charges, restrictive covenants | Confirms ownership risks, lender restrictions, and covenants that can block exit strategies |
| Title | Title Plan (EGL358846) | Land Registry plan showing the edged red boundary | Boundary accuracy affects refurb, extensions, access, and disputes |
| Auction Contract | Special Conditions of Sale | Lot specific contract terms overriding general auction conditions | Hidden cost triggers, completion traps, buyer risk transfer, and limited seller liability |
| Seller Disclosures | TA6 Property Information Form (redacted) | Seller’s answers on disputes, alterations, services, heating, utilities, parking | Highlights missing certificates, condition issues, and unknowns that spook lenders |
| Seller Disclosures | TA10 Fittings and Contents Form | Included/excluded fixtures and chattels | Affects refurb scope, surprises on handover, and claim disputes post-completion |
| Searches | Regulated Water & Drainage Report (Thames Water) | Drainage connection + sewers within boundary | Sewers can block extensions and add build-over approval cost and delay |
| Searches | Regulated Personal Search Report (Local Authority) | LLC, highways adoption, planning constraints, Article 4 entries, designations | Determines whether you can do HMO change-of-use, PD assumptions, and planning risk |
| Energy | EPC | Energy performance certificate | Impacts lettability, mortgage criteria, and future compliance costs |
Red flag dashboard (what must be checked before auction)
| Priority | Red flag | Where it appears | Why it matters | Action before bidding |
|---|---|---|---|---|
| Critical | Central heating marked NOT in good working order | TA6 (Central heating section) | Direct refurb cost uplift, potential damp/pipework issues, lender surveyor down-valuations | Treat as “system replacement or major repair” until proven otherwise (get contractor estimate, check boiler age/pressure, radiators, controls) |
| Critical | Title restriction: no disposition registered without lender consent | Register (Restriction referencing charge dated 13 Nov 2014 in favour of Just Retirement Money Limited) | If not discharged correctly, you can complete but struggle to register, refinance, or sell cleanly | Solicitor must confirm charge discharge process + ensure seller provides DS1/e-DS1 or equivalent on completion |
| High | Electrical works: tested in 2010; rewired/works since 2005 = YES, certificates to follow | TA6 (Electricity section) | Missing EICR/Part P evidence can cause mortgage delays, insurance issues, and costly remedial works | Assume you will commission a new EICR and budget for remedials. Ask auctioneer if any certs will be uploaded |
| High | Special Conditions: Notice to Complete = 2 calendar days + extra fee 1% + VAT (min £2,000 + VAT) | Special Conditions of Sale | Completion trap. Any funding delay becomes expensive fast | Have funds ready, solicitor instructed pre-auction, and a realistic completion plan. Avoid bidding if funding is not unconditional |
| High | Public sewer recorded within the boundary | Water & Drainage Report | Can restrict extensions and require build-over consent, adding delay/cost and limiting GDV upside plans | If your plan involves rear extension, confirm sewer location and build-over feasibility with Thames Water process |
| Medium | Services crossing boundaries marked Not known | TA6 (Services crossing section) | Unknown easements and shared services can create disputes and limit works | Treat as “unknown risk”. Check drains layout during refurb and be cautious with boundary excavations |
| Medium | Parking: residents/permit + controlled parking zone = Yes | TA6 (Parking) | Impacts renter demand and buyer pool on resale | Check permit eligibility, cost, and any waiting list |
1) Title review (HM Land Registry) | Title number EGL358846
What the register confirms
- Tenure: Freehold
- Title class: Title absolute
- Registered restriction tied to an existing charge: no disposition to be registered without lender consent (charge dated 13 Nov 2014 in favour of Just Retirement Money Limited)
- Charges Register includes a historic conveyance dated 18 November 1898 with a detailed Schedule of restrictive covenants
Key title risks and what they mean for investors
| Item | What it says (plain English) | Investor impact | What to verify |
|---|---|---|---|
| Restriction linked to lender charge | Land Registry will not register your purchase unless the required written consent/discharge route is satisfied | If mishandled, it can block registration, refinance, and resale timelines | Solicitor to confirm discharge evidence on completion (DS1/e-DS1) and ensure restriction is complied with |
| Restrictive covenants (1898) | Includes boundary fencing obligations, building line controls, “private dwellinghouses only” language, prohibited trades/uses, and road/footpath repair obligations | Can complicate change-of-use strategies, certain commercial uses, and some extension positions | Solicitor to assess enforceability today, who has benefit of covenant, and whether your intended works breach it |
| Roads / footpaths wording in covenant schedule | Historic covenant language suggests responsibilities around roads/footpaths in front of the lot until adopted | Usually low-day-to-day impact, but can appear in legal due diligence and occasionally affects disputes | Cross-check with highways search result (this pack shows Parkstone Road is adopted) |
Note for investors
The register also notes the original plan did not show “T marks” or a building line. That does not remove the covenants. It simply means the plan copy held at first registration did not display those markings. If you intend works that push the frontage line or add extensions, treat covenant compliance as a live risk until your solicitor confirms otherwise.
2) Auction Contract review | Special Conditions of Sale
What matters most (these clauses cost money)
- Deposit: 10% of purchase price (or minimum £8,000) payable immediately after exchange
- Title deduction if seller not yet registered: buyer accepts title is deduced via copy registers and certified copy extract of transfer/contract (price redacted). This is common in some auction chains, but it is still a timing risk
- Buyer accepts responsibility for notices, planning, and building regulation matters: buyer confirms they have satisfied themselves and will raise no objection and demand no contribution
- Contents left behind: buyer responsible for any remaining contents on completion, removal at buyer’s cost
- Notice to Complete service: by email/fax counts as served the same day if sent before 5pm
- Notice to Complete completion window: 2 calendar days (excluding the day notice is given)
- Notice to Complete penalty costs: buyer pays 1% + VAT of purchase price or £2,000 + VAT (whichever is more) for seller’s extra legal/admin costs
- Risk transfer on exchange: property is at buyer’s risk from exchange, seller not obliged to insure, no price reduction if damage occurs
- Transfer indemnities: buyer covenants to observe title covenants and indemnifies the seller for breach post-transfer
- Planning/bedroom size waiver language: buyer cannot object regarding bedroom sizes meeting minimum requirements and must satisfy themselves on use/permissions
- Keys/deeds: buyer cannot requisition if keys/deeds unavailable or lost
Investor view
These Special Conditions are seller-protective. The completion mechanics are the biggest trap: a 2-day Notice to Complete window can quickly trigger penalty fees and jeopardise bridging exits or mortgage switches. If your funding is not fully lined up, this contract structure turns “minor delays” into expensive problems.
Pre-auction actions
- Have your solicitor review Special Conditions before bidding and confirm your completion timeline
- If you plan bridging, have valuation, legals, and drawdown timeline mapped against the auction completion date and the 2-day NTC risk
- Budget for clearance if contents are left behind
- Ensure your insurance starts at exchange (not completion)
3) Seller disclosures | TA6 (Property Information Form)
High-impact findings
| Topic | Seller answer | Investor meaning | Risk level |
|---|---|---|---|
| Party Wall matters | Party Wall documentation marked “To follow” | Indicates there may have been notifiable works or neighbour notices. Missing docs can create dispute risk | Medium |
| Planning proposals nearby | No | Low direct risk, still do your own planning check if exit relies on street appeal | Low |
| Windows since 2002 | No | Suggests no modern replacement requiring FENSA evidence | Low |
| Guarantees (damp proof, timber, windows) | No | No safety net. If damp shows up, it is on you | Medium |
| Electricity testing | Tested Yes, year stated as 2010, certificate To follow | Old test date. Assume new EICR required and budget remedials | High |
| Rewire / electrical works since 2005 | Yes, supporting certificates To follow | Missing Part P / completion evidence can be a lender problem | High |
| Central heating | Central heating present Yes (gas), installed date input shows 2015, completion certificate marked Not known. Heating NOT in good working order. Service history not provided | Treat as immediate capex. This is a real cost driver and can delay lettings and refinance | Critical |
| Drainage connection (TA6) | Connected to mains foul and surface water marked Not known | Seller uncertainty. Cross-check with Water & Drainage report (which indicates YES to both) | Medium |
| Flooding | Property flooding No. Flood Risk Report prepared No | Good sign, but still check flood map if insurance is sensitive | Low |
| Radon | Radon test carried out No | Usually minor. The Local Authority search indicates the area is < 1% above action level | Low |
| Japanese knotweed | No | Still visually inspect the garden and neighbouring boundaries | Low |
| Services crossing boundaries | Not known (multiple questions) | Unknown easements can surprise during refurb, especially drainage works | Medium |
| Parking | Residents/permit. Controlled parking zone Yes | Tenant and resale consideration. Check permit rules | Medium |
| Occupiers | Seller does not live there. No other occupiers aged 17+ indicated | Good sign, but auction buyers still need vacant possession confirmed in contract/pack | Medium |
Investor notes on TA6 reliability
TA6 is a seller disclosure, not a guarantee. The “Not known” and “To follow” answers are where risk hides. Where certificates are missing, the practical investor position is to assume you will pay to re-certify or remediate unless the auctioneer uploads the evidence before the sale.
4) Seller disclosures | TA10 (Fittings and Contents)
Practical handover implications
Based on the TA10, several fixtures and kitchen items are marked as included. This reduces “missing items” surprises post-completion, but it does not change the condition risk flagged in TA6 (heating and electrics).
Highlights (what is included)
- Boiler/immersion heater, radiators, electric fires, sockets, door fittings, burglar alarm
- Kitchen items included: fitted hob, extractor hood, oven/grill, cooker, microwave; free-standing fridge-freezer and washing machine
- Bathroom basics included: bath, shower fitting for bath, taps, cabinet, towel rail, mirror
- Light fittings included across the listed rooms
- Outdoor: dustbins and garden shed included
Items marked as none (examples)
- No dishwasher, no tumble dryer, no separate shower unit, and many outdoor extras marked none
5) Water & Drainage (Thames Water report)
Key results
- Foul drainage drains to a public sewer: Yes
- Surface water drains to a public sewer: Yes
- Property connected to mains water: Yes
- Public sewer map shows a public sewer within the boundary: Yes
Investor meaning
The “sewer within boundary” point is the key one. If your value-add plan includes rear extension, outbuilding, or significant landscaping, you may need build-over consent and you could be constrained on what you can do and where. This can limit your “max GDV upside” plan if that plan assumed easy extension.
Pre-auction action if your exit needs an extension
- Identify the likely sewer route from the attached plan in the water report
- Adjust your extension assumptions and timeline to allow for permissions/approvals
6) Local Authority search (Regulated Personal Search)
Highways
- Parkstone Road is adopted (highway maintainable at public expense)
- No adoption bond/waiver issues revealed for the road
Article 4 planning constraints (material for strategy)
The search includes two Article 4(1) Direction entries recorded as planning charges:
- Article 4 (borough-wide HMO control): confirmed and in force. It removes permitted development rights for change of use from Class C3 (dwellinghouse) to Class C4 (small HMO). Planning permission is therefore required for C3 to C4 in Waltham Forest.
- Article 4 (A1 use change controls): a further Article 4 Direction covering certain change-of-use routes from Class A1 to other uses. This is typically location-dependent and relates more to retail parades/town centre areas. Confirm whether the mapped area covers this street.
Investor meaning
If your plan includes an HMO angle, you must assume a planning application is required (no “permitted development shortcut”). This affects timeline, cost, and certainty of exit.
Other planning and environmental indicators
The search indicates:
- No planning permissions revealed in the report for this property
- No enforcement notice revealed
- No tree preservation order revealed
- Radon affected area indicator: < 1% of properties above action level
- CIL charging schedule exists (check council policy if your plan triggers CIL liability)
7) EPC review
- Property type: Mid-terrace house
- Total floor area: 69 sq m
- Current rating: C (score 71)
- Potential rating: B (score 87)
- Valid until: 18 September 2035
Investor meaning
EPC C is a strong baseline for lettings and reduces near-term compliance pressure. It does not offset the mechanical risk flagged in TA6 (heating not working). A property can have a decent EPC while still needing immediate heating repairs.
For more information on the Legal pack, view the legal pack section.
Kill-test checklist (legal pack focused)
| Kill test | Pass condition | If it fails | What you do |
|---|---|---|---|
| Title charge discharge | Solicitor confirms charge will be discharged and restriction complied with at completion | Registration and refinance risk | Bid only if solicitor is comfortable with discharge evidence and process |
| Heating not working | You have a realistic repair/replacement budget and timeline | Refurb overrun, voids, lender down-valuation | Price the risk into your max bid and assume worst-case until proven |
| Electrical compliance evidence | Either certs appear in pack OR you budget for new EICR and remedials | Mortgage and insurance friction | Do not assume it is fine. Cost it |
| Sewer within boundary | Your exit does not rely on rear extension OR you confirm build-over feasibility | Extension plan compromised | Adjust GDV upside assumptions before bidding |
| Special Conditions completion trap | Funding and legal timeline can complete without drama | Penalty fees and forced completion risk | Bid only if funding is genuinely ready. Avoid “hope financing” |
Bottom-line legal view
This lot’s legal pack is workable, but it is not “clean and easy”. The standout risks are mechanical condition (heating not working), missing/unknown compliance evidence for electrics and heating installation, a title restriction linked to an existing lender charge that must be discharged correctly, and seller-protective Special Conditions (2-day Notice to Complete and penalty costs). Treat these as price-setting risks, not footnotes.
Disclaimer: Decision support only, not legal/financial advice. Always inspect the property and satisfy yourself on condition and structure before bidding. Always have your solicitor confirm covenants, auction conditions, special conditions, and any title restrictions before bidding.
Analysis date: 17 February 2026. Check the auctioneer website for any updates, new documents, amendments, or addendums.
Investment Financials
Detailed figures supplied by the deal source. Use these figures as a starting point for your own investment analysis.
Acquisition & Project Costs
Projected Outcome
Financial information is supplied by the listing source and may not include all purchase, finance, tax, legal, holding, refurbishment or disposal costs. Investors should independently verify all figures and assumptions before proceeding.
Analyse This Deal Yourself
The figures above are provided by the listing source. Use one of our calculators below to test the assumptions using your own costs, finance terms and investment criteria.
Property Deal Stack-Up Calculator
Compare how this property may perform as a Flip, Buy-to-Let or BRRR investment using your own assumptions.
After submitting your figures, UncommonDeal will create a personalised comparison of the Flip, Buy-to-Let and BRRR strategies using the assumptions you entered.
UK Auction Property ROI Calculator
Test an auction property using your own purchase, refurbishment, finance, resale and rental assumptions.
Investment Assessment
Ready to Analyse Your Deal?
Enter your assumptions above, then analyse the deal to receive an instant investment assessment including projected profit, ROI, rental yield and overall deal quality.
Live Auction Deal Assessment
Auction Investment Assessment
Your live auction deal verdict, investment score and key findings will update using the figures entered above.
Our Assessment
Enter your assumptions above and click Analyse Your Deal to generate an investment assessment.
Key Findings
Recommended Next Steps
Important Due Diligence Notice
Property investment opportunities listed on UncommonDeal are provided by independent deal sources, advertisers and other third-party property professionals. Unless expressly stated otherwise, UncommonDeal does not independently verify every detail, financial figure or investment assumption contained within a listing.
Before making any investment decision, you should carry out your own independent due diligence and verify all relevant information, including the property condition, purchase price, comparable values, rental estimates, refurbishment costs, planning matters, legal title, financing assumptions, taxes, fees and projected returns.
Property investment involves risk. Figures and projections shown within a listing are estimates only and should not be treated as guarantees of future performance or returns.
We write rarely, but only the best content.
Please check your email for a confirmation email.
Only once you've confirmed your email will you be subscribed to our newsletter.