Financial Snapshot (Indicative)
Figures are indicative and based on information provided by the listing source. They are not a full investment appraisal.
12 Maria Street, Harwich, Essex CO12 3HT is a four bedroom end of terrace house being offered at Savills auction on Tuesday 24 February 2026. This Harwich auction property is vacant, arranged over three storeys, and is positioned as a modernisation opportunity with potential to extend (subject to requisite consents), making it relevant for flip, buy to let, and BRRR strategies in the CO12 market.
Property quick facts
| Property address | 12 Maria Street, Harwich, Essex, CO12 3HT |
| Auction date | Tuesday 24 February 2026 (Savills Auction) (check auction whebsite for any change in starting / guide price) |
| Guide price | TBA on listing site (check auction whebsite for any change in starting / guide price) |
| Auction starting bid price | £75,000 (check auction whebsite for any change in starting / guide price) |
| Type of property | Three storey, four bedroom, end of terrace house (Freehold) |
| Number of rooms | 4 |
| Tenure | Freehold |
| Accommodation (summary) | Ground: Front Room, Kitchen / Lounge / Diner, Bathroom. First: Two Bedrooms. Second: Two Bedrooms. |
| More images on | view on listing site |
Property description
A three storey four bedroom end of terrace house offered vacant and positioned as a modernisation and renovation project. The layout provides a ground floor front room plus a kitchen / lounge / diner arrangement and bathroom, with two bedrooms on the first floor and two bedrooms on the second floor. The property benefits from a rear garden and is marketed as having potential to extend, subject to the required consents.
Planning permission and permitted development rules for this property fall under the local authority. Buyers should review the relevant planning guidance on the
local council planning portal
before relying on any extension, change of use, or development assumptions.
Market reference points (evidence available)
| Type | Address | Price / rent | Timing |
|---|---|---|---|
| Sold | 49 Albert Street, Harwich, CO12 3HY | £203,000 | March 2025 |
| Sold | 76 West Street, Harwich, CO12 3DA | £183,000 | July 2025 |
| Sold | 45 Albert Street, Harwich, CO12 3HX | £161,900 | January 2025 |
| Sold | 49 Albert Street, Harwich, CO12 3HY | £165,000 | May 2025 |
| Listed for sale | Albemarle Street, Harwich | £210,000 | Current listing |
| Listed for sale | West Street, Harwich, Essex, CO12 | £250,000 | Current listing |
| Listed for sale | Albemarle Street, Harwich | £210,000 | Current listing |
| Listed to let | Vansittart Street, Harwich | £1,250 pcm | Current listing |
| Listed to let | Albert Street, Harwich | £1,200 pcm | Current listing |
| Listed to let | Albert Street, Harwich | £1,250 pcm | Current listing |
Is the property inside the Article 4 areas for the town?
Yes. Tendring District Council has an Article 4 Direction relating to small HMOs (C3 to C4), so planning permission is required for that change of use. Underwrite any HMO angle as upside only unless your planning position is confirmed.
Costs visible on Savills auction guidance (plus buyer checks)
| Cost item | Amount / rule | Notes |
|---|---|---|
| Deposit | 10% of purchase price | Payable on the day if successful |
| Buyer fee (Savills) | £2,100 for any sale at or above £30,000 | Buyer payable |
| Other lot specific charges | Check Special Conditions in the auction pack | Seller legal fees, arrears, title costs, VAT election, etc can apply |
Buyer action: always check the auction pack for any other cost that may be relevant to this property, including special conditions, seller cost recovery clauses, arrears, title charges, and VAT status.
List assumptions used (so the caps are decision grade)
| Assumption | Base used |
|---|---|
| Bridging interest | 0.9% per month (6 months, 9 months, 12 months exit) |
| Bridge leverage | 80% of purchase price (interest charged on the loan balance) |
| Bridge fees (model) | Arrangement and exit fees included in totals (confirm your lender quote) |
| Purchase costs (model) | Buyer fee, SDLT assumption, legals, searches, valuation, utilities holding allowance |
| Sale costs (flip) | Agent fee and sale legals included in totals (confirm your route and fee) |
| BTL mortgage stress | Base rate and higher stress rate shown (confirm lender ICR and product availability) |
Produce three Refurb stress tests
| Stress test | Refurb budget | What it represents |
|---|---|---|
| Minimum | £25,000 | Cosmetic plus targeted upgrades, limited surprises |
| Medium | £40,000 | Typical full modernisation allowance for older terraces |
| Maximum | £60,000 | Strip out plus higher contingency outcome |
Compare these three GDV scenarios
| Scenario | GDV used | Interpretation |
|---|---|---|
| A (Low) | £170,000 | Conservative outcome anchored by lower sold evidence available |
| B (Mid) | £200,000 | Balanced outcome if refurb spec is strong and buyers respond well |
| C (High) | £230,000 | Optimistic outcome aligned with higher nearby asking levels after a strong finish |
Produce three Max bid scenarios (targets minimum £40k net flip profit after all costs)
These caps are set to target a minimum of £40,000 net flip profit after typical costs. If your legal pack includes extra seller cost recovery clauses, reduce caps.
| Scenario | GDV | Refurb | Exit timeline | Suggested max bid | If bid is £75,000 (profit can be below £40k) |
|---|---|---|---|---|---|
| Conservative | £170,000 | £40,000 | 12 months | £68,100 | ~£32,100 |
| Balanced | £200,000 | £40,000 | 9 months | £96,500 | ~£55,200 |
| Optimistic | £230,000 | £25,000 | 6 months | £145,000 | ~£118,000 |
Mini auction day checklist (5 items)
- Reconfirm the guide price and any addendum updates on the auction website before bidding.
- Confirm buyer fee (£2,100) and the deposit process, and have funds ready.
- Read Special Conditions for any extra seller cost recovery and deadline clauses.
- Hard Stop Rule: do not exceed the hard stop cap in live bidding.
- Have your solicitor confirm title, covenants, auction conditions, and any special conditions before bidding.
Output “hard stop” cap + Absolute walk-away cap
| Cap | Value | Basis |
|---|---|---|
| Hard stop cap | £68,100 | Designed to still target ~£40k net profit under GDV A, medium refurb, 12 month exit |
| Absolute walk-away cap | £85,600 | Break-even ceiling under a harsh downside stress (GDV A, maximum refurb, 12 month exit) |
FULL MATRIX: Net flip profit (£)
Viewer friendly matrix showing net flip profit at the starting bid (£75,000) across the three GDVs, three refurb stress tests, and 6 / 9 / 12 month bridging exits at 0.9% per month. Use this to see how margin compresses when refurb or timeline slips.
| GDV | Refurb | 6 months | 9 months | 12 months |
|---|---|---|---|---|
| A £170,000 | Min £25,000 | ~£52,200 | ~£49,600 | ~£47,100 |
| A £170,000 | Med £40,000 | ~£37,200 | ~£34,600 | ~£32,100 |
| A £170,000 | Max £60,000 | ~£17,200 | ~£14,600 | ~£12,100 |
| B £200,000 | Min £25,000 | ~£82,500 | ~£80,000 | ~£77,400 |
| B £200,000 | Med £40,000 | ~£57,700 | ~£55,200 | ~£52,600 |
| B £200,000 | Max £60,000 | ~£30,200 | ~£27,600 | ~£25,000 |
| C £230,000 | Min £25,000 | ~£111,500 | ~£109,000 | ~£106,500 |
| C £230,000 | Med £40,000 | ~£90,700 | ~£88,200 | ~£85,700 |
| C £230,000 | Max £60,000 | ~£65,700 | ~£63,100 | ~£60,600 |
GDV Scenario A, B, and C for Min, Mid, and Max bid (Refurb and exit timeline sensitivity)
Min bid uses the hard stop cap. Mid bid uses £75,000. Max bid uses the scenario max bid to target £40k where applicable. Profits shown are net estimates after typical costs.
| GDV | Bid level | Refurb (Med) | 6 months | 9 months | 12 months |
|---|---|---|---|---|---|
| A £170,000 | Min bid (£68,100) | £40,000 | ~£44,800 | ~£42,300 | ~£40,000 |
| A £170,000 | Mid bid (£75,000) | £40,000 | ~£37,200 | ~£34,600 | ~£32,100 |
| A £170,000 | Max bid (not applicable) | £40,000 | Use hard stop for A | Use hard stop for A | Use hard stop for A |
| B £200,000 | Min bid (£68,100) | £40,000 | ~£67,300 | ~£64,800 | ~£62,200 |
| B £200,000 | Mid bid (£75,000) | £40,000 | ~£57,700 | ~£55,200 | ~£52,600 |
| B £200,000 | Max bid (£96,500) | £40,000 | ~£45,900 | ~£40,000 | ~£34,000 |
| C £230,000 | Min bid (£68,100) | £40,000 | ~£100,300 | ~£97,800 | ~£95,200 |
| C £230,000 | Mid bid (£75,000) | £40,000 | ~£90,700 | ~£88,200 | ~£85,700 |
| C £230,000 | Max bid (£145,000) | £40,000 | ~£51,000 | ~£45,000 | ~£39,000 |
Flip vs BTL cashflow comparison (with stress test)
Rents referenced: £1,200 pcm to £1,250 pcm. BTL model assumes 75% LTV interest only and includes a cost allowance for management, maintenance, voids, and insurance. Stress rate is shown to highlight how fragile cashflow can become.
| Rent | Valuation base | Net monthly cashflow (base rate) | Net monthly cashflow (stress rate) |
|---|---|---|---|
| £1,200 pcm | £200,000 (Scenario B) | ~£210 pcm | ~£24 pcm |
| £1,250 pcm | £200,000 (Scenario B) | ~£250 pcm | ~£63 pcm |
BRRR (recycle potential)
BRRR performance depends on the refinance valuation and lender criteria. In the mid and high valuation cases, the model suggests you may be able to recycle most of your capital (subject to valuation and lender limits). In the low valuation case, you may leave some cash in.
| Refinance valuation | Illustrative outcome (bid £75k, refurb £40k, 9 months) | Interpretation |
|---|---|---|
| £170,000 (A) | Cash left in is likely (low single digit thousands) | Still close to full recycle if the valuation holds |
| £200,000 (B) | Potential to recycle most or all capital | Depends on lender limits and valuation evidence available |
| £230,000 (C) | Potential to recycle most or all capital | Do not assume this until valuation is confirmed |
Kill test legal pack checklist
| Document | Kill test question | Walk away trigger |
|---|---|---|
| Special Conditions of Sale | Are there extra fees, deadlines, penalties, or seller cost recovery? | High add-on costs that break the cap or unusual completion penalties |
| Official title and plan | Do boundaries, access rights, and restrictions match the reality on site? | Missing rights of way, restrictive covenants blocking works, boundary conflicts |
| Local authority searches | Any enforcement notices, road adoption issues, or adverse entries? | Active enforcement, compulsory purchase risk, contaminated land flags |
| EPC and compliance | Does compliance cost change refurb and exit assumptions? | EPC upgrade cost that pushes refurb into maximum stress case |
| Planning history | Any refused precedent impacting extension or change of use? | Refusal patterns that block the strategy you are relying on |
Legal pack section
For more information on the Legal pack, view the legal pack section.
Risk table (attached documents)
Legal documents for this lot are behind the login wall on the listing site. Use the table below to record risks you find when you open the legal pack, then re-run caps if any fee or title risk is confirmed.
| Document found in legal pack | What to scan for | Risk impact on this deal |
|---|---|---|
| Special Conditions of Sale | Extra fees, seller legal costs, completion deadlines, interest clauses | Directly reduces net profit and can invalidate max bid caps |
| Title register and plan | Rights, covenants, boundaries, access, restrictions | Can block extension plans or create saleability issues |
| Searches | Enforcement, highway, tree orders, notices | Can add time cost or force strategy change |
| EPC | Rating and improvement measures | May increase refurb and affect letting viability |
| Planning documents | History, constraints, refused applications | Can remove extension or HMO upside |
Simple deal summary (spreadsheet style): how returns change with bid and refurb
Base shown uses GDV B (£200,000) and a 9 month exit so you can see the sensitivity clearly.
| Purchase price | Profit with refurb £25k | Profit with refurb £40k | Profit with refurb £60k |
|---|---|---|---|
| £68,100 | ~£70,000 | ~£62,200 | ~£44,600 |
| £75,000 | ~£80,000 | ~£55,200 | ~£27,600 |
| £96,500 | ~£52,000 | ~£40,000 | ~£23,000 |
Verdict
At £75,000 the flip is strong under GDV B and GDV C, but under GDV A the net profit can fall below the £40k target depending on refurb and timeline. If you want a decision-grade cap that protects you in the downside case, treat £68,100 as the hard stop and do not bid above it unless your GDV and refurb scope are verified and the legal pack does not add costs.
Bottom line
If you are buying this as a flip, your price discipline must be set by the downside scenario (GDV A with medium to maximum refurb and longer exit). The model supports upside at the £75,000 starting bid, but the £40,000 net target is not guaranteed unless your refurb and exit assumptions stay controlled.
Disclaimer: Decision support only, not legal/financial advice. Buyers should view the property and make sure that they are satisfied structurally before bidding. Always have your solicitor confirm covenants, auction conditions, and any special conditions before bidding.
Legal Pack Analysed (Investor Preview)
This is not a summary.
This is a buyer-grade legal risk review.
Every auction and sourced deal comes with a legal pack.
Most investors either skim it… or ignore it entirely.
That’s where expensive mistakes happen.
Below analysis breaks down the actual risks, restrictions, and hidden clauses inside the legal pack that directly affect:
- Whether you can finance the deal
- Whether your exit works
- Whether the numbers you ran are even valid
Documents reviewed (what is actually in this pack)
| Document | Why it matters | Risk level |
|---|---|---|
| Special Conditions of Sale | Overrides the General Conditions and can add hidden costs, delay risk, and buyer liability | High |
| Official Copy Register of Title (EX446325) | Confirms tenure, ownership, restrictions, charges, and historic covenants | Medium |
| Official Copy Title Plan (EX446325) | Confirms general boundary position and plot outline | Low |
| EPC | Impacts BTL compliance, refinance, and future capex assumptions | Medium |
Red flag dashboard (fix these before auction day)
| Red flag | Where it appears | Why it matters to investors | Pre-auction action |
|---|---|---|---|
| Completion is fixed and seller can delay | Special Conditions | Bridging and holding costs can rise if completion slips. This directly reduces flip margin. | Model a delay buffer. Confirm your lender drawdown and extension terms. |
| Squatter / unlawful occupation risk with no buyer remedy | Special Conditions | You must still complete, with no price reduction or delay allowed. High downside tail-risk. | Inspect close to auction. Confirm access and vacancy. Price in risk. |
| Risk transfers to buyer at exchange | Special Conditions | Any damage after exchange is your problem, even if the seller does not insure. | Arrange buildings insurance immediately if you bid and win. |
| Extra seller costs payable by buyer | Special Conditions | Adds to all-in cost and reduces profit. No invoice is provided. | Include in your cap. Confirm VAT treatment with solicitor. |
| Restrictions and charge on title | Title Register | Seller must provide solicitor undertakings to remove or deal with charges and restrictions. Your lender will care. | Solicitor to confirm discharge route and the undertaking wording. |
| Historic restrictive covenants with missing deed | Title Register | Can restrict alterations or use. Missing deed increases uncertainty for extensions or major works. | Solicitor to advise on covenant risk and whether indemnity insurance is sensible. |
Section 1: Special Conditions of Sale (auction contract risk review)
These Special Conditions override the General Conditions where there is conflict. They are drafted to reduce seller liability and shift cost, timing risk, and condition risk to the buyer. :contentReference[oaicite:0]{index=0}
1.1 Completion and delay mechanics
- Contractual completion date: 31 March 2026. :contentReference[oaicite:1]{index=1}
- Seller can delay completion up to 10 working days and you cannot claim compensation. You are also prevented from serving Notice to Complete during that delay window. :contentReference[oaicite:2]{index=2}
- If completion monies arrive after 2pm, completion is treated as next working day and the seller can treat it as buyer default. :contentReference[oaicite:3]{index=3}
Investor impact
- Bridging risk: if you are running bridging, any delay increases interest and may force an extension.
- Flip timeline risk: a forced timing slip compresses margin and increases probability of missing a planned resale window.
1.2 Vacant possession clause with occupation trap
- Property is sold with vacant possession, however if any part is squatted or unlawfully occupied (before lot is offered, or between exchange and completion), the buyer must still complete and cannot delay or claim price reduction. :contentReference[oaicite:4]{index=4}
Investor impact
- High downside tail-risk. If this happens, your refurb start date and resale plan can fail. Your lender may also refuse drawdown depending on occupancy status.
1.3 Risk transfers at exchange, seller not obliged to insure
- From exchange, the property is solely at the buyer’s risk and the seller has no obligation to insure. Any damage or deterioration does not allow price reduction or delay. :contentReference[oaicite:5]{index=5}
Investor impact
- You need buildings insurance ready for same day exchange. If the property is damaged after exchange, your all-in costs can jump with no contractual remedy.
1.4 Limited title guarantee and “knowledge” clause
- Limited title guarantee is given.
- Matters recorded on registers open to public inspection are treated as within the buyer’s actual knowledge. :contentReference[oaicite:6]{index=6}
Investor impact
- You cannot later argue you did not know about covenants, charges, restrictions, or other registrable matters.
1.5 No assignment, no sub-sale, no trust before completion
- Buyer cannot assign, transfer the benefit, sub-sell, declare trust, or otherwise deal prior to completion. :contentReference[oaicite:7]{index=7}
Investor impact
- This blocks certain sourcing and quick-onward-sale structures. Your bid should assume you must complete in the purchasing entity.
1.6 Default interest rate and Notice to Complete costs
- Default interest is 10% over Lloyds Bank base rate. :contentReference[oaicite:8]{index=8}
- If seller serves Notice to Complete, buyer pays seller solicitor costs £750 + VAT as a condition of completion. :contentReference[oaicite:9]{index=9}
Investor impact
- Late completion becomes very expensive very quickly. This is a margin-killer on flips.
1.7 Buyer pays seller’s solicitor and seller’s costs
- Buyer pays £150 + VAT per transfer for engrossment prepared by seller’s solicitors (invoice not provided). :contentReference[oaicite:10]{index=10}
- Buyer must pay seller £2,000 + VAT toward seller’s legal and agent costs. No invoices provided. :contentReference[oaicite:11]{index=11}
Investor impact
- These are hard costs that reduce net profit and should be treated as non-negotiable in your max bid model.
1.8 Seller may not be registered proprietor
- Buyer agrees not to insist seller is registered proprietor before completion and accepts undertakings instead. :contentReference[oaicite:12]{index=12}
- Buyer must complete even if there is a charge, unilateral notice, restriction, or other adverse entry where seller’s solicitors have an undertaking from a regulated conveyancer to remove it. :contentReference[oaicite:13]{index=13}
Investor impact
- This is not automatically a deal-breaker, but your solicitor must confirm the undertaking is acceptable and enforceable, and your lender may have conditions.
1.9 “Sold as seen” and broad buyer acceptance clauses
- Buyer confirms opportunity to satisfy themselves on notices, planning, building regs and purchases with full knowledge, raising no objections or contributions. :contentReference[oaicite:14]{index=14}
- Buyer cannot refuse because they could not enter to inspect or obtain a valuation prior to completion. :contentReference[oaicite:15]{index=15}
- Buyer buys subject to structural issues (if any) and Japanese Knotweed (if any). :contentReference[oaicite:16]{index=16}
Investor impact
- Condition risk is pushed onto you. For flips and BRRR, this increases the need for a contingency and a strict hard stop cap.
1.10 Enquiries discouraged and chargeable
- No enquiries answered the day before or day of completion.
- Seller not obliged to respond to enquiries after contract date. If they do respond, they can charge £350 per hour + VAT. :contentReference[oaicite:17]{index=17}
Investor impact
- Assume you will not get comfort letters or clarifications late in the process. Anything material must be understood before bidding.
Section 2: Official Copy Register of Title (Title No. EX446325)
This confirms the legal estate, registered owner, and the key restrictions and charges that must be dealt with on completion. :contentReference[oaicite:18]{index=18}
2.1 Tenure and property description
- Freehold title, edged red on the filed plan, being 12 Maria Street, Harwich (CO12 3HT). :contentReference[oaicite:19]{index=19}
- Title class: Title Absolute. :contentReference[oaicite:20]{index=20}
2.2 Registered proprietor and historic price
- Registered proprietor: Angus John Elphinstone. :contentReference[oaicite:21]{index=21}
- Price stated paid on 30 August 2006: £125,000. :contentReference[oaicite:22]{index=22}
2.3 Restriction affecting disposition
- Restriction: no disposition is to be registered without written consent signed by the proprietor of the charge dated 30 August 2006 (Topaz Finance Limited). :contentReference[oaicite:23]{index=23}
Investor impact
- This usually means the charge must be discharged (or consented) so Land Registry can register you as owner.
- Your solicitor must confirm the mechanism and the undertaking used in the auction completion process.
2.4 Registered charge and “further advances” note
- Registered charge dated 30 August 2006, proprietor Topaz Finance Limited (trading as Rosinca Mortgages). :contentReference[oaicite:24]{index=24}
- Chargee has an obligation to make further advances, and those advances have priority to the extent of section 49(3) LRA 2002. :contentReference[oaicite:25]{index=25}
Investor impact
- This reinforces why the discharge and undertakings must be watertight on completion.
2.5 Historic restrictive covenants (1871 conveyance) with missing deed
- A conveyance dated 28 November 1871 contains restrictive covenants, but the original deed or certified copy was not produced on first registration. :contentReference[oaicite:26]{index=26}
Investor impact
- Unknown covenants can affect extensions, alterations, and change of use assumptions.
- If your strategy relies on extension, layout changes, or intense refurbishment, ask your solicitor whether covenant indemnity insurance is sensible, and whether any covenant is likely enforceable in practice.
Section 3: Official Copy Title Plan (EX446325)
The title plan shows the general boundary position only and may not be to scale when printed. :contentReference[oaicite:27]{index=27}
3.1 What to check on the plan
- Confirm the red edging matches the physical plot you view on site (rear boundary, alleyways, access strips).
- Confirm there is no mismatch between the physical extent and what is edged red (especially any yard or rear garden area).
- Boundary lines are “general position”, not the exact legal boundary line. :contentReference[oaicite:28]{index=28}
Investor impact
- Most terrace titles are straightforward, but any mismatch can impact valuation, resale, or buyer confidence at exit.
Section 4: EPC (Energy Performance Certificate)
The EPC affects letting legality today, future compliance risk, and can influence refinance valuation and tenant demand. :contentReference[oaicite:29]{index=29}
4.1 EPC headline
- Current rating: E (51) and valid until 11 February 2036. :contentReference[oaicite:30]{index=30}
- Property type: end-terrace house. Total floor area: 94 sq m. :contentReference[oaicite:31]{index=31}
- Potential rating: B (81). :contentReference[oaicite:32]{index=32}
4.2 Letting compliance position
- Properties can be let if they have a rating from A to E. This is lettable today on EPC E. :contentReference[oaicite:33]{index=33}
4.3 EPC improvement risk drivers (capex indicators)
| Feature | EPC notes | Risk to BTL / BRRR |
|---|---|---|
| Walls | Solid brick and cavity wall noted, no insulation (assumed), rated poor. :contentReference[oaicite:34]{index=34} | Future EPC tightening could force upgrades. Budget for insulation where feasible. |
| Flat roof | Flat roof limited insulation rated very poor. :contentReference[oaicite:35]{index=35} | Potential refurbishment uplift cost and survey attention point. |
| Heating controls | Programmer, no room thermostat, very poor. :contentReference[oaicite:36]{index=36} | Low-cost improvement that can lift EPC and reduce tenant complaints. |
| Lighting | Below average lighting efficiency, very poor. :contentReference[oaicite:37]{index=37} | Easy EPC gains with LED upgrade. |
Investor impact
- BTL: lettable today, but assume EPC related capex in your long-term plan.
- BRRR: EPC uplift can support valuation and rental demand, but costs must be controlled.
Financing and exit risk notes (what a lender and buyer will care about)
- Title charge and restriction: your lender will expect clean discharge and registration pathway. :contentReference[oaicite:38]{index=38}
- Seller not registered within last 6 months: acceptable in some cases, but increases reliance on undertakings. :contentReference[oaicite:39]{index=39}
- Sold as seen and inspection limitations: increases valuation risk if you cannot inspect or if survey reveals defects. :contentReference[oaicite:40]{index=40}
- Exit buyer confidence: restrictive covenants (unknown detail) can spook buyers if your works appear “non-standard”. :contentReference[oaicite:41]{index=41}
Pre-auction buyer actions (priority checklist)
- Solicitor instruction: confirm discharge/undertaking route for Topaz charge and restriction, and confirm registration pathway without delay. :contentReference[oaicite:42]{index=42}
- Confirm completion risk: model seller delay up to 10 working days and ensure your funding can tolerate it. :contentReference[oaicite:43]{index=43}
- Vacancy verification: view close to auction and confirm occupancy status. The contract removes buyer remedies if unlawful occupation occurs. :contentReference[oaicite:44]{index=44}
- Insurance: be ready to insure immediately on exchange because risk transfers to you and seller is not obliged to insure. :contentReference[oaicite:45]{index=45}
- Costs locked in: add £2,000 + VAT seller costs, £150 + VAT transfer prep, and Notice to Complete risk costs into your cap. :contentReference[oaicite:46]{index=46}
- Covenant risk: ask solicitor about the 1871 restrictive covenants entry where deed was not produced and whether indemnity is appropriate. :contentReference[oaicite:47]{index=47}
- EPC strategy: decide if you will leave EPC at E (short-term lettable) or plan uplift works during refurb to improve refinancing and long-term resilience. :contentReference[oaicite:48]{index=48}
Key deal-grade conclusion (legal)
This pack is strongly seller-weighted. The contract removes many buyer protections, adds buyer-paid seller costs, and pushes condition, timing, and occupation risk onto the buyer. This does not automatically kill the deal, but it does justify strict price discipline and a hard stop cap that assumes delays and unknowns can happen.
Disclaimer: Decision support only, not legal/financial advice. Buyers should view the property and make sure that they are satisfied structurally before bidding. Always have your solicitor confirm covenants, auction conditions, and any special conditions before bidding.
Analysis date: 19 February 2026. Auction packs can be updated by the auctioneer. Always check the auctioneer website for addendums, revised special conditions, updated title documents, or new disclosures before bidding.
Investment Financials
Detailed figures supplied by the deal source. Use these figures as a starting point for your own investment analysis.
Acquisition & Project Costs
Projected Outcome
Financial information is supplied by the listing source and may not include all purchase, finance, tax, legal, holding, refurbishment or disposal costs. Investors should independently verify all figures and assumptions before proceeding.
Analyse This Deal Yourself
The figures above are provided by the listing source. Use one of our calculators below to test the assumptions using your own costs, finance terms and investment criteria.
Property Deal Stack-Up Calculator
Compare how this property may perform as a Flip, Buy-to-Let or BRRR investment using your own assumptions.
After submitting your figures, UncommonDeal will create a personalised comparison of the Flip, Buy-to-Let and BRRR strategies using the assumptions you entered.
UK Auction Property ROI Calculator
Test an auction property using your own purchase, refurbishment, finance, resale and rental assumptions.
Investment Assessment
Ready to Analyse Your Deal?
Enter your assumptions above, then analyse the deal to receive an instant investment assessment including projected profit, ROI, rental yield and overall deal quality.
Live Auction Deal Assessment
Auction Investment Assessment
Your live auction deal verdict, investment score and key findings will update using the figures entered above.
Our Assessment
Enter your assumptions above and click Analyse Your Deal to generate an investment assessment.
Key Findings
Recommended Next Steps
Important Due Diligence Notice
Property investment opportunities listed on UncommonDeal are provided by independent deal sources, advertisers and other third-party property professionals. Unless expressly stated otherwise, UncommonDeal does not independently verify every detail, financial figure or investment assumption contained within a listing.
Before making any investment decision, you should carry out your own independent due diligence and verify all relevant information, including the property condition, purchase price, comparable values, rental estimates, refurbishment costs, planning matters, legal title, financing assumptions, taxes, fees and projected returns.
Property investment involves risk. Figures and projections shown within a listing are estimates only and should not be treated as guarantees of future performance or returns.
We write rarely, but only the best content.
Please check your email for a confirmation email.
Only once you've confirmed your email will you be subscribed to our newsletter.