Financial Snapshot (Indicative)
Figures are indicative and based on information provided by the listing source. They are not a full investment appraisal.
This report summarises the key deal inputs and financial scenarios for 128 Sefton Street, Southport, Merseyside, PR8 5DB, listed on Landwood Property Auctions as an unconditional online auction sale. The property is presented as a 3 bedroom semi-detached renovation opportunity in Southport, within close proximity to the town centre and local transport routes. Use this page to frame your maximum bid, compare flip vs buy-to-let vs BRRR outcomes, and decide what level of margin is realistic once auction fees, finance, and refurbishment are included.
3 bedroom semi-detached
Southport PR8
Flip, BTL, BRRR
Property quick facts
| Item | Details |
|---|---|
| Property address | 128 Sefton Street, Southport, Merseyside, PR8 5DB |
| Auction date | Bidding Opens On 25th Feb 2026 12:40 hour and Scheduled End Date 25th Feb 2026 13:10 hour |
| Auction starting bid price | £95,000 (check auction website for any change in starting / guide price) |
| Guide price (listing) | £95,000 plus |
| Type of property | Semi-detached house (3 bedrooms) |
| Tenure | Freehold |
| Size (listing) | Gross internal area stated as 101 sq. m (1,087 sq. ft) |
| Buyers administration fee | £3,000 (inc VAT) payable upon exchange of contracts |
| More images on |
view on listing site |
Mobile tip: swipe tables left and right.
Property description
Vacant 3 bedroom semi-detached house marketed as a former caretaker’s home, now requiring renovation and general updating. The layout is described as an entrance hall leading to two reception rooms with a kitchen to the rear, and a first floor landing serving three bedrooms and a bathroom. The outside space is described as front and rear gardens with several outbuildings, offering scope for a value-add refurbishment if condition and title allow.
Planning permission and permitted development rules for this property fall under the local authority. Buyers should review the relevant planning guidance on the
local council planning portal
before relying on any extension, change of use, or development assumptions.
Quick Investor Verdict
General auction note: auction purchases move quickly and the buyer is expected to complete on the auction terms, so due diligence must be completed before bidding.
- Vacant possession and clear refurbishment angle
- Comparable evidence suggests a realistic resale range if finished to the local standard
- Online auction can create pricing inefficiencies, both positive and negative
- Fees, finance and holding time reduce margin faster than expected
- Condition surprises can escalate costs
- Legal pack special conditions can add hidden liabilities
- Financial scenarios and max bid caps
- BTL and BRRR comparison with stress tests
- Legal pack kill tests and document risk checks
Property Analysis
- 68 Sefton Street, Southport, PR8 6SH sold for £215,000 in February 2025
- 66 Sefton Street, Southport, PR8 6SH sold for £270,000 in November 2024 (slightly bigger property)
- 42 Linaker Street, Southport, PR8 6RP sold for £195,000 in February 2025 (slightly smaller property)
Recently listed for sale (within 0.25 mile radius)
- 98 Sefton Street, Southport, Merseyside, PR8 5DB listed for £249,999 (Sold STC)
- Linaker Street, Southport listed for £200,000 (Sold STC)
- Sefton Street, Southport, PR8 listed for £195,000 (tenant currently situated)
Recently listed to let (similar size and rooms)
- Lord Street, Southport, PR9 listed for £1,100 pcm (Let agreed)
- Janes Brook Road, Southport, PR8 listed for £1,150 pcm
- Hart Street, Southport, Merseyside, PR8 listed for £1,095 pcm
| Scenario | GDV assumption | How to read it |
|---|---|---|
| GDV A (Min) | £195,000 | Conservative exit aligned to the lower nearby sold reference and tenant constrained listing levels |
| GDV B (Mid) | £215,000 | Mid exit aligned to a strong nearby sold reference on Sefton Street |
| GDV C (Max) | £250,000 | Optimistic exit aligned to strong nearby asking levels and high-end finish assumptions |
Tip: treat GDV C as a bonus, not a plan, unless finish and buyer demand clearly support it.
Article 4 areas for the town
Yes. Southport is covered by Article 4 direction controls for HMOs, and Sefton has implemented wider Article 4 coverage across the borough. If your plan relies on an HMO style conversion, assume planning consent is required and confirm on the council portal before bidding.
| Category | Assumption |
|---|---|
| Auction fee | £3,000 buyers administration fee (inc VAT) payable upon exchange, plus buyer to check legal pack for any other costs |
| Acquisition costs | Allow for solicitor, survey, and typical buyer costs (shown in the model below as standard allowances) |
| Stamp duty | Model assumes an investor style surcharge basis (final SDLT depends on buyer profile and ownership structure) |
| Refurb stress tests | Minimum £30,000, Medium £45,000, Maximum £65,000 |
| Bridging finance | 75% LTV, 0.9% per month interest, terms modelled at 6, 9, 12 months; arrangement fee assumed; some lenders may retain interest upfront |
| Sales costs (flip) | Agent and legal sale costs assumed as standard allowances (confirm with your agent and solicitor) |
| Buy to let operating costs | Allowances for management, maintenance, voids, and insurance included for stress testing |
| Rule | Cap | Meaning |
|---|---|---|
| Hard stop cap | £107,000 | Decision-grade cap aimed to keep a minimum £40,000 flip margin achievable in the mid GDV scenario with a medium refurb and a 9 month exit window |
| Absolute walk-away cap | £143,000 | Approximate break-even cap on the mid GDV scenario with a medium refurb and a 9 month exit window; beyond this, the flip becomes marginless even before extra surprises |
Auction day checklist (5 items)
- Confirm you can fund the deposit and fees immediately on success
- Re-check the legal pack special conditions and completion timetable
- Confirm your bridging or cash plan is ready and timeboxed
- Confirm your refurb budget and contingency is locked
- Apply the Hard Stop Rule and do not chase the lot
Flip analysis
| GDV Scenario | Refurb Stress | 6 months max bid | 9 months max bid | 12 months max bid |
|---|---|---|---|---|
| GDV A (Min) | Minimum | £105,078 | £102,747 | £100,500 |
| GDV A (Min) | Medium | £91,260 (below starting bid) | £89,182 (below starting bid) | £87,178 (below starting bid) |
| GDV A (Min) | Maximum | £72,835 (below starting bid) | £71,094 (below starting bid) | £69,416 (below starting bid) |
| GDV B (Mid) | Minimum | £123,273 | £120,608 | £118,040 |
| GDV B (Mid) | Medium | £109,454 | £107,043 | £104,718 |
| GDV B (Mid) | Maximum | £91,029 (below starting bid) | £88,955 (below starting bid) | £86,956 (below starting bid) |
| GDV C (Max) | Minimum | £155,113 | £151,865 | £148,734 |
| GDV C (Max) | Medium | £141,294 | £138,300 | £135,413 |
| GDV C (Max) | Maximum | £122,870 | £120,213 | £117,651 |
Where a max bid is shown as below starting bid, it indicates the £40,000 target margin is unlikely at the current entry price under that stress combination.
Profit may still exist, but it is not within the £40,000 to £100,000 target band.
This matrix shows net profit after typical auction costs, bridging costs, selling costs, and holding allowances.
6 months exit window
| Bid (£) | Minimum refurb | Medium refurb | Maximum refurb |
|---|---|---|---|
| £95,000 | £70,690 | £55,690 | £35,690 |
| £100,000 | £65,262 | £50,262 | £30,262 |
| £105,000 | £59,835 | £44,835 | £24,835 |
| £110,000 | £54,408 | £39,408 | £19,408 |
| £115,000 | £48,980 | £33,980 | £13,980 |
| £120,000 | £43,552 | £28,552 | £8,552 |
| £125,000 | £38,125 | £23,125 | £3,125 |
| £130,000 | £32,698 | £17,698 | £-2,302 |
| £135,000 | £27,270 | £12,270 | £-7,730 |
9 months exit window
| Bid (£) | Minimum refurb | Medium refurb | Maximum refurb |
|---|---|---|---|
| £95,000 | £68,316 | £53,316 | £33,316 |
| £100,000 | £62,629 | £47,629 | £27,629 |
| £105,000 | £56,944 | £41,944 | £21,944 |
| £110,000 | £51,258 | £36,258 | £16,258 |
| £115,000 | £45,572 | £30,572 | £10,572 |
| £120,000 | £39,887 | £24,887 | £4,887 |
| £125,000 | £34,201 | £19,201 | £-801 |
| £130,000 | £28,516 | £13,516 | £-6,484 |
| £135,000 | £22,830 | £7,830 | £-12,170 |
12 months exit window
| Bid (£) | Minimum refurb | Medium refurb | Maximum refurb |
|---|---|---|---|
| £95,000 | £65,942 | £50,942 | £30,942 |
| £100,000 | £59,996 | £44,996 | £24,996 |
| £105,000 | £54,053 | £39,053 | £19,053 |
| £110,000 | £48,109 | £33,109 | £13,109 |
| £115,000 | £42,166 | £27,166 | £7,166 |
| £120,000 | £36,223 | £21,223 | £1,223 |
| £125,000 | £30,280 | £15,280 | £-4,720 |
| £130,000 | £24,337 | £9,337 | £-10,663 |
| £135,000 | £18,394 | £3,394 | £-16,606 |
Same refurb assumption (Medium) shown across 6, 9, and 12 month exit windows.
6 months exit window
| Bid scenario | Bid (£) | GDV A (Min) | GDV B (Mid) | GDV C (Max) |
|---|---|---|---|---|
| Starting / baseline bid | £95,000 | £35,940 | £55,690 | £90,252 |
| Hard stop cap (decision-grade) | £107,000 | £22,765 | £42,515 | £77,078 |
| Stretch bid (margin compression) | £125,000 | £3,015 | £23,125 | £57,687 |
9 months exit window
| Bid scenario | Bid (£) | GDV A (Min) | GDV B (Mid) | GDV C (Max) |
|---|---|---|---|---|
| Starting / baseline bid | £95,000 | £33,566 | £53,316 | £87,879 |
| Hard stop cap (decision-grade) | £107,000 | £20,144 | £39,894 | £74,457 |
| Stretch bid (margin compression) | £125,000 | £-801 | £19,201 | £53,764 |
12 months exit window
| Bid scenario | Bid (£) | GDV A (Min) | GDV B (Mid) | GDV C (Max) |
|---|---|---|---|---|
| Starting / baseline bid | £95,000 | £31,192 | £50,942 | £85,504 |
| Hard stop cap (decision-grade) | £107,000 | £17,522 | £37,272 | £71,834 |
| Stretch bid (margin compression) | £125,000 | £-4,720 | £15,280 | £49,843 |
Buy to let analysis
BTL modelling assumes a refinance style debt at 75% of GDV, and stress tests interest at 5.5% and 7.0%.
Operating allowances included for management, maintenance, voids and insurance.
| GDV scenario | Rent assumption | Net monthly (5.5% rate) | Net monthly (7.0% rate) |
|---|---|---|---|
| GDV A (Min) | £1,095 pcm | £171 | £-12 |
| GDV A (Min) | £1,125 pcm | £195 | £12 |
| GDV A (Min) | £1,150 pcm | £215 | £32 |
| GDV B (Mid) | £1,095 pcm | £102 | £-100 |
| GDV B (Mid) | £1,125 pcm | £126 | £-76 |
| GDV B (Mid) | £1,150 pcm | £146 | £-56 |
| GDV C (Max) | £1,095 pcm | £24 | £-187 |
| GDV C (Max) | £1,125 pcm | £48 | £-163 |
| GDV C (Max) | £1,150 pcm | £68 | £-143 |
BRRR analysis
Shows indicative cash left in the deal after refinance at 75% of GDV, after repaying the bridge and standard refinance fees.
This is scenario-based and depends on actual valuation, lender policy, and works quality.
| Bid level | Bid (£) | GDV scenario | Refi loan (75% GDV) | Cash back at refi | Cash left in deal | Equity after refi |
|---|---|---|---|---|---|---|
| Starting bid | £95,000 | GDV A (Min) | £146,250 | £74,250 | £16,737 | £48,750 |
| Starting bid | £95,000 | GDV B (Mid) | £161,250 | £89,250 | £1,737 | £53,750 |
| Starting bid | £95,000 | GDV C (Max) | £187,500 | £115,500 | £-24,513 | £62,500 |
| Hard stop cap | £107,000 | GDV A (Min) | £146,250 | £64,500 | £23,699 | £48,750 |
| Hard stop cap | £107,000 | GDV B (Mid) | £161,250 | £79,500 | £8,699 | £53,750 |
| Hard stop cap | £107,000 | GDV C (Max) | £187,500 | £105,750 | £-17,551 | £62,500 |
| Stretch bid | £125,000 | GDV A (Min) | £146,250 | £51,000 | £38,958 | £48,750 |
| Stretch bid | £125,000 | GDV B (Mid) | £161,250 | £66,000 | £23,958 | £53,750 |
| Stretch bid | £125,000 | GDV C (Max) | £187,500 | £92,250 | £-2,292 | £62,500 |
Negative cash left in indicates a higher cash requirement at refinance, not a profit.
Simple deal summary (spreadsheet style)
| Purchase price | Profit with Minimum refurb | Profit with Medium refurb | Profit with Maximum refurb |
|---|---|---|---|
| £95,000 | £68,316 | £53,316 | £33,316 |
| £105,000 | £56,944 | £41,944 | £21,944 |
| £107,000 | £54,669 | £39,894 | £19,894 |
| £115,000 | £45,572 | £30,572 | £10,572 |
| £125,000 | £34,201 | £19,201 | £-801 |
| £135,000 | £22,830 | £7,830 | £-12,170 |
Legal pack section
- AML Requirements
- Terms and Conditions
- Assisted Bidding Form
- Extra Material Information
- EPC document
- Guide to Bidding
- Legal documents require login to view
For more information on the Legal pack, view the legal pack section.
Kill test legal pack checklist (do not bid until cleared)
| Kill test item | What to confirm | Why it matters |
|---|---|---|
| Special conditions | Extra fees, seller cost recovery, unusual completion terms, penalty clauses | These can remove your margin even if the purchase price looks good |
| Title and restrictions | Restrictive covenants, easements, access rights, boundary responsibilities | Blocks exit plans, complicates resale, or increases legal risk |
| Tenure and vacant possession | Freehold confirmation, occupation status, any adverse possession issues | Unexpected occupancy problems destroy timelines |
| Searches and notices | Local authority search, enforcement notices, compulsory purchase risk if relevant | Unexpected notices can stop mortgageability or force works |
| Condition risk triggers | Damp, roof, structure, non-standard construction, prior subsidence claims | Refurb overrun is the fastest route to a failed flip |
Document-by-document risk checks (based on evidence available)
| Document | Main purpose | Common buyer risk | What to do |
|---|---|---|---|
| Terms and Conditions | Sets auction rules, exchange mechanics, buyer obligations | Completion deadlines and default penalties can be severe | Confirm completion timetable, deposit rules, default consequences |
| Extra Material Information | Additional disclosures required for marketing compliance | May highlight constraints not in the description | Scan for tenure notes, services, utilities, access, restrictions |
| AML Requirements | Buyer identity and funds checks | Delays can risk exchange timelines | Prepare ID and funds evidence before bidding day |
| EPC | Energy performance rating | Future letting constraints and upgrade costs | Check rating and likely upgrade scope during refurb |
| Guide to Bidding | Explains platform bidding mechanics | Proxy bids and bid extensions can cause overbidding | Set max bid before the auction and follow Hard Stop Rule |
| Assisted Bidding Form | Process for assisted bidding where needed | Administrative errors can prevent bids being placed | Only use if necessary and submit early |
| Legal documents (login) | Official title, searches, special conditions, contract pack | Hidden obligations, boundary issues, unusual seller conditions | Solicitor review before bidding, confirm special conditions and title |
Always budget for additional pack-related costs if special conditions require buyer to reimburse seller expenses, search costs, or other disbursements.
Verdict
Bid
if you can hold the purchase at or below £107,000 and your refurb stays within the medium stress band, with a realistic exit in 9 months or less.
Caution
between £107,001 and £125,000, because margin compresses quickly and profitability becomes highly dependent on GDV and refurb control.
Walk Away
above £125,000 unless you have strong evidence available for GDV C and a verified lower refurb scope. Absolute walk-away cap is £143,000 on the mid scenario.
At the starting bid level, the deal can still produce profit on a flip in several scenarios, but the ability to hit a £40,000 to £100,000 margin depends on keeping the purchase price within the decision-grade cap range and controlling refurbishment and time on bridge.
Decision support only, not legal/financial advice. View the property and make sure that you are satisfied structurally before bidding. Always have your solicitor confirm covenants, auction conditions, and any special conditions before bidding.
Legal Pack Analysed (Investor Preview)
This is not a summary.
This is a buyer-grade legal risk review.
Every auction and sourced deal comes with a legal pack. Most investors either skim it… or ignore it entirely.
That’s where expensive mistakes happen.
Below analysis breaks down the actual risks, restrictions, and hidden clauses inside the legal pack that directly affect:
- Whether you can finance the deal
- Whether your exit works
- Whether the numbers you ran are even valid
| Risk Area | What the legal pack says | Why it matters (investor impact) | Action before auction |
|---|---|---|---|
| Completion timeline + seller costs |
Completion is 20 business days after contract date. Buyer must pay £1,000 seller legal costs at completion and £300 if a Notice to Complete is served. Seller has no obligation to insure after contract date. |
Tight completion window impacts bridging drawdown, conveyancing speed, and refurb start. Insurance risk sits with buyer after exchange. £1,000 is a fixed extra cost that must be in your bid model. |
Line up solicitor, lender, and building insurance before bidding. Add £1,000 plus possible £300 into costs. Confirm auction payment method requirements. |
| Restrictive covenants (major) |
Title contains covenants that (a) restrict using the property for trade/business/employment that may be nuisance/offensive, and (b) restrict erecting new buildings or altering/changing the elevation/external appearance without consent from the original estate owner/vendor (per 1957 conveyance wording). |
This can block or delay extensions, dormers, external changes, and some conversion plans. It can also affect buyer demand and mortgageability if your exit assumes works that are covenant-restricted. |
Ask your solicitor to identify who now holds the benefit of the covenant, whether consent is realistically obtainable, and whether indemnity insurance is possible (and acceptable to lenders) for your intended works. |
| “Sold subject to” clauses + buyer indemnity |
Special conditions attempt to exclude/limit statutory title covenants (LP(MP)A 1994), sell “as seen”, push broad risks to the buyer, and include a purchaser indemnity in favour of the vendor for matters the property is sold subject to. |
If something exists (local land charges, notices, easements, planning issues), you may carry the risk with limited comeback. Indemnity wording can increase exposure after completion. | Treat searches and survey as non-negotiable. Make your solicitor check enforceability and impact on finance and resale, and advise on any lender objections to reduced title protections. |
| Possible “yearly rent” with no receipt | Vendor states it cannot produce an up-to-date receipt for any yearly rent (if any) and buyer assumes liability for any arrears up to completion, and must not delay completion for this. | If a rentcharge or similar exists, arrears can create unexpected cost and conveyancing risk, and can worry some lenders. | Ask solicitor to confirm whether a rentcharge exists, who collects it, likely arrears, and what evidence can be obtained quickly. Price in a contingency if unclear. |
| Shared access / repair contribution | Deed of Grant indicates rights over a shared passage/driveway and a 50/50 (moiety) contribution to keeping it in repair. | Ongoing cost exposure and neighbour coordination risk. Also matters for buyer appeal if access is tight, disputed, or poorly maintained. | Inspect passage condition. Check for any historic neighbour disputes, encroachment, or practical access limitations. Budget future maintenance. |
| Electrical safety |
EICR is unsatisfactory with C2 items, with a remedials quote provided to correct items 5, 6, 7 at £159.50 + VAT (subject to assumptions and potential additional works if supply is not in reasonable condition). |
Immediate compliance cost before letting. Also suggests other condition issues may exist due to vacancy and limited maintenance. | Treat the quote as minimum. Assume additional electrical remedials may appear once works start. Plan compliance timeline if BTL/BRRR. |
| Seller knowledge limitations | Seller repeatedly states it has not occupied the property and buyers must rely on their own inspections, searches, and investigations. Asbestos survey not held. | “Not to our knowledge” is not a clean bill of health. Your due diligence must replace missing vendor knowledge, especially on damp, subsidence, asbestos, alterations, and planning. | Commission a survey, asbestos assessment (as appropriate), and run full searches. Bid as if hidden defects exist unless proven otherwise. |
| Section | Document | What it controls | Investor sensitivity |
|---|---|---|---|
| A. Auction contract | Special Conditions of Sale | Completion timetable, extra buyer payments, insurance position, title covenant modifications, buyer obligations | High |
| A. Auction contract | Sales Memorandum | Confirms deposit/admin fee and exchange/completion placeholders | Medium |
| B. Title and rights | Official Copy Register (MS551970) | Restrictive covenants, rights reserved, references to historic deed | High |
| B. Title and rights | Title Plan + Disposal Plan | Extent, boundaries, context on surrounding roads and plots | Medium |
| B. Title and rights | Deed of Grant (08.05.1968) | Access rights and repair contributions over shared passage/drive | High |
| C. Enquiries and disclosures | Pre-contract Enquiries (Council form) | Seller knowledge limits, insurance note, knotweed disclosure style answers | Medium |
| C. Enquiries and disclosures | CPSE.1 Replies (Sefton Council) | Broad legal disclosures, repeated “buyer to rely on searches”, maintenance/condition comments | High |
| D. Condition and compliance | EPC + Flood Risk Summary + EICR and remedials quote + TA10 fittings form | Letting readiness and insurance risk indicators | Medium |
1) Special Conditions of Sale: key clauses that change your risk
| Clause / topic | Position in pack | Investor meaning | Red flag level |
|---|---|---|---|
| Completion in 20 business days | Agreed completion date | Short fuse. Any delay triggers interest and may trigger a Notice to Complete fee. Bridging and solicitor readiness must be pre-arranged. | High |
| Buyer pays seller legal costs £1,000 | Additional amounts payable at completion | Fixed extra cost. Must be included in max bid and profit model. Not optional. | Medium |
| Notice to Complete fee £300 | Additional amounts if notice served | Adds cost plus legal pressure. Treat as avoid-at-all-costs by ensuring funds and solicitor capacity. | Medium |
| Seller not obliged to insure after contract date | Insurance (G3) | You carry the risk from exchange. If damage occurs, the loss may sit with you even before completion. | High |
| Title covenant modifications + “as seen” sale | Extra special conditions | Reduced seller responsibility and wider buyer acceptance of unknowns. Lender solicitors sometimes query this. Solicitor must confirm lender acceptability (if financed). | High |
| Possible yearly rent (if any) with no receipt, buyer assumes arrears | Extra special conditions: Title | Quiet cost item. If a rentcharge exists, arrears could be payable and evidence may be hard to obtain quickly. | High |
| Buyer indemnity + non-assignment/subsales restrictions | Extra special conditions | Limits flexibility if you planned a sub-sale/nomination. Also increases exposure where vendor seeks indemnity protection. | High |
2) Sales Memorandum: what it confirms
- Confirms seller is Sefton Metropolitan Borough Council and references Landwood Property Auctions.
- States Buyer’s Administration Fee is due at exchange and is non-refundable (amount is inserted on the memo at exchange, so treat as unknown until confirmed on auction terms).
- All figures exclusive of VAT (check if VAT applies to the admin fee and auctioneer fees).
1) Official Copy Register (MS551970): deal-critical entries
| Register section | Key entry | Practical investor impact | Checks |
|---|---|---|---|
| Property Register | 1957 provision that purchasers are not entitled to rights (light/air/drainage/easements) that would restrict the vendor’s building/use of adjoining estate land. | You may have limited ability to object if adjoining land is developed and affects light/amenity, depending on facts. This can matter to long-term hold value and buyer perception. | Street context scan, local planning searches for nearby plots, factor future development risk into exit assumptions. |
| Charges Register | Restrictive covenant: cannot use for trade/business/employment that might become a nuisance/offensive. | Generally ok for normal residential letting, but can complicate some operating models (high turnover complaints, certain business use, etc.). | Solicitor to advise scope/enforceability and whether any historic breach exists. |
| Charges Register | Restrictive covenant: cannot erect new buildings or alter/change elevation/external appearance without submitting plans and obtaining consent from the vendor/estate owner. | Major development blocker for extensions, dormers, external remodels, and potentially some conversions. Planning permission does not remove covenant consent. | Critical: identify who benefits now, consent process, time and cost. Consider indemnity insurance only with solicitor and lender approval. |
| Rights reserved | Rights of light/air/drainage etc reserved to the vendor and others for adjoining lands. | Supports the future development risk point. You cannot assume protections. | Factor into hold-risk narrative and exit strategy if nearby development could affect value. |
2) Deed of Grant (08.05.1968): access rights + repair costs
- Rights of way are granted over the shared passage/driveway.
- The deed indicates a shared maintenance obligation expressed as a moiety (50/50) contribution to the cost of keeping the driveway/passage in repair.
- Practical risk: access disputes, maintenance cost, and future repair events that are hard to budget.
3) Transfer (draft): buyer acceptance framing
- Draft transfer language pushes multiple risk buckets to the buyer: matters discoverable by inspection, unknown matters the seller could not reasonably know, and matters that prudent searches would have disclosed.
- Also includes provisions deeming public register matters within buyer’s knowledge for statutory covenant purposes, increasing the importance of your searches.
1) Pre-contract Enquiries (Council): what it actually tells you
- Seller states it has not occupied the property and answers are not given with detailed personal knowledge.
- For boundaries, services, council tax band, access rights, and works/permissions: buyer is directed back to title/deeds and to rely on searches and inspection.
- Insurance: property insured under the Council’s block policy (but the special conditions state the seller has no obligation to insure after contract date, so do not assume cover continues for you).
- Japanese knotweed: “not to our knowledge” but buyer should rely on searches/inspection.
2) CPSE.1 Replies (Commercial Property Standard Enquiries): investor-grade takeaways
| Topic | Reply theme | Why it matters | Red flag / watchout |
|---|---|---|---|
| Physical condition | Limited maintenance prior to vacancy and “needs work”. Seller not in occupation; buyer must inspect and survey. | Hidden defects are plausible (damp/rot/services/subsidence). Seller replies do not clear this risk. | High |
| Asbestos | Seller does not have an asbestos survey. | Refurb costs and timelines can jump. Disposal has compliance costs. | High |
| Utilities and meters | Buyer to rely on searches; some meter location detail given. | Vacant properties can have disconnected supplies, unknown meter status, or compliance needs before letting. | Medium |
| Vacancy date | Property became vacant May 2025. | Long vacancy increases risk of damp/ventilation issues, vandalism, and service degradation. | Medium |
| Planning and CIL | Buyer to rely on searches. Seller notes Council does not have a CIL in place and no current plans to introduce it. | Do not assume historic alterations are compliant. Covenant consent is separate from planning consent. | High |
| Notices, disputes, environmental | Often “none so far as aware” plus “buyer to rely on searches and investigations”. | This shifts risk. Your searches are the evidence available that matters. | High |
1) Electrical (EICR + remedials quote)
- EICR outcome: Unsatisfactory (contains C2 observations). Inspection/testing limitations are also stated.
- Remedials quote provided: £159.50 + VAT to correct items 5, 6 and 7, subject to assumptions and possible additional works if the installation is not in reasonable condition.
- Investor view: treat the quote as a minimum, not a cap.
2) EPC
- EPC rating shown as D (floor area shown as 101 sq m), valid until 10 October 2035.
- Investor view: D is typically lettable, but upgrades should align with future compliance and tenant profile.
3) Flood Risk Summary
- Surface water flood risk shown as very low.
- Rivers and sea flood risk shown as very low for current and the 2036-2069 view.
- Investor view: still confirm insurer terms for a vacant property.
4) TA10 Fittings and Contents Form (seller is Council)
- Form is completed in a “seller not in occupation” context. Some items are marked as not inspected.
- Investor view: assume you are buying the building, not a guaranteed set of chattels. Verify critical items on viewing.
- Covenant consent barrier: if your value add depends on extensions/external changes, confirm whether consent is obtainable, by whom, and the likely timeline and cost.
- Yearly rent / rentcharge uncertainty: if solicitor cannot confirm existence and arrears risk quickly, treat as a priced risk (contingency) or pause.
- Insurance gap after exchange: if you cannot put cover in place immediately at exchange, do not bid.
- Title covenant modifications unacceptable to lender: if finance is required, lender solicitor approval must be verified early.
- Shared access repair liability: if the passage/drive is in poor condition or disputed, future cost and neighbour conflict can harm exit value.
| Risk | Where it appears | Why it matters | Priority |
|---|---|---|---|
| External alterations require consent | Title (Charges Register covenant) | Can block extension plans, change GDV, and impact the exit buyer pool. | Critical |
| Yearly rent/rentcharge receipt missing | Special Conditions (extra special conditions) | Potential arrears liability and lender concerns. | Critical |
| Seller knowledge limitations | CPSE.1 + Council pre-contract enquiries | You cannot rely on disclosures to clear structural and services risk. | High |
| Asbestos unknown | CPSE.1 | Refurb cost/timeline and disposal compliance risk. | High |
| Shared access repair contribution | Deed of Grant | Future cost exposure and neighbour friction risk. | Medium |
| Electrical remedials and limitations | EICR + Quote | Letting compliance cost and potential unknown additional works. | Medium |
- Solicitor to confirm covenant restrictions, who benefits, and whether a consent/insurance route is viable for intended works.
- Confirm whether any rentcharge/yearly rent exists, who collects it, and whether arrears are likely.
- Put buildings insurance in place to start at exchange.
- Run searches: Local Authority, Drainage & Water, Environmental, Chancel (as relevant), and Coal/Mining where relevant.
- Survey: at minimum a full building survey due to “limited maintenance” and long vacancy.
Disclaimer (decision support only, not legal/financial advice): This legal pack review is provided for investor decision support only.
Buyers should view the property and ensure they are satisfied structurally and condition-wise before bidding.
Always have your solicitor confirm covenants, auction conditions, and any special conditions before bidding.
Analysis date: 18 February 2026. Check the auctioneer website for any updates or revised documents after this date.
Investment Financials
Detailed figures supplied by the deal source. Use these figures as a starting point for your own investment analysis.
Acquisition & Project Costs
Projected Outcome
Financial information is supplied by the listing source and may not include all purchase, finance, tax, legal, holding, refurbishment or disposal costs. Investors should independently verify all figures and assumptions before proceeding.
Analyse This Deal Yourself
The figures above are provided by the listing source. Use one of our calculators below to test the assumptions using your own costs, finance terms and investment criteria.
Property Deal Stack-Up Calculator
Compare how this property may perform as a Flip, Buy-to-Let or BRRR investment using your own assumptions.
After submitting your figures, UncommonDeal will create a personalised comparison of the Flip, Buy-to-Let and BRRR strategies using the assumptions you entered.
UK Auction Property ROI Calculator
Test an auction property using your own purchase, refurbishment, finance, resale and rental assumptions.
Investment Assessment
Ready to Analyse Your Deal?
Enter your assumptions above, then analyse the deal to receive an instant investment assessment including projected profit, ROI, rental yield and overall deal quality.
Live Auction Deal Assessment
Auction Investment Assessment
Your live auction deal verdict, investment score and key findings will update using the figures entered above.
Our Assessment
Enter your assumptions above and click Analyse Your Deal to generate an investment assessment.
Key Findings
Recommended Next Steps
Important Due Diligence Notice
Property investment opportunities listed on UncommonDeal are provided by independent deal sources, advertisers and other third-party property professionals. Unless expressly stated otherwise, UncommonDeal does not independently verify every detail, financial figure or investment assumption contained within a listing.
Before making any investment decision, you should carry out your own independent due diligence and verify all relevant information, including the property condition, purchase price, comparable values, rental estimates, refurbishment costs, planning matters, legal title, financing assumptions, taxes, fees and projected returns.
Property investment involves risk. Figures and projections shown within a listing are estimates only and should not be treated as guarantees of future performance or returns.
We write rarely, but only the best content.
Please check your email for a confirmation email.
Only once you've confirmed your email will you be subscribed to our newsletter.