Financial Snapshot (Indicative)
Figures are indicative and based on information provided by the listing source. They are not a full investment appraisal.
32 Deptford High Street, Deptford, London, SE8 4AF
Property auction London
Commercial with residential planning permission
Located at 32 Deptford High Street, Deptford, London, SE8 4AF, this mixed use freehold investment property is being offered via
property auction with existing commercial income and confirmed residential planning permission. The asset combines a sizable
ground and lower ground commercial footprint with upper parts and a rear element that carry genuine planning led development potential.
This report separates the income value from the planning uplift, stress-tests the risks, and sets a disciplined maximum bid range
for investors.
| Item | Details |
|---|---|
| Property address | 32 Deptford High Street, Deptford, London, SE8 4AF |
| Type of property | Mid-terrace mixed use freehold with commercial across lower ground and ground floor, first floor ancillary, and a rear garage element. |
| Auction date | 4 March 2026 (2:00pm). |
| Guide price | £325,000+ (plus fees). |
| Auction website page link | View lot on Auction House London |
| Tenure | Freehold. |
| Current income | The lot headline quotes £14,640 pa, while the tenancy section on the same page references £14,460 pa. Treat the legal pack and lease as the source of truth. |
| Lease notes (high impact) | Lease is stated as expiring 3 August 2026. Seller has served a Section 25 notice. Tenant indicates they want a new lease on a smaller area. This is material to both income stability and how you phase any works. |
| EPC | B (as stated on the lot page). |
| Buyer admin charge | £1,800 including VAT (unless varied by addendum). |
| Floor area (from plan provided) | Approx GIA 154 sq m / 1,659 sq ft (Ground 121 sq m + Lower Ground 33 sq m). |
A Deptford High Street mixed-use freehold with two-level commercial accommodation plus upper ancillary space and a rear garage element.
The core decision is not the passing rent alone. The value lever is planning-led: the consented route creates two residential units
via a first-floor plus loft conversion and a separate three-storey residential build to the rear (facing Reginald Square), while retaining
the commercial unit. This is a hybrid deal that rewards purchase discipline, programme control, and realistic exit pricing.
UncommonDeal verdict snapshot
Planning-led mixed use (income plus development uplift)
Consented two-unit residential delivery on a high street mixed-use freehold
Overpaying for unapproved extra drawings and underestimating condition-driven costs and programme drift
This is not a yield purchase at scale. The rent stabilises the hold, but the investment case is the planning uplift.
The deal stacks only if you price it as: (commercial income value) plus (consented residential residual), with real buffers.
Planning position (value what is consented)
- Conversion of first floor and loft space at 32 Deptford High Street, including window changes and a rear dormer.
- Construction of a three-storey building facing Reginald Square.
- Outcome: 2 self-contained residential units plus amenity, refuse and cycle storage, and air source heat pumps.
- Decision notice references a Unilateral Undertaking (S106) and flags CIL liability.
Marketing references additional drawings for extra flats. Drawings are not permission. This report underwrites only the consented
two-unit scheme unless you separately verify further consents in the planning portal.
- Heritage and frontage: shopfront treatment, façade approach, and restoration requirements can add cost and approvals time.
- Acoustics: sound insulation and post-install testing can trigger upgrades and rework if targets are not met.
- Archaeology: written scheme and possible delay risk during groundworks if further works are triggered.
- ASHP noise compliance: plant location and attenuation may be constrained.
- CIL and S106: budget, trigger timing, and any monitoring fees must be confirmed early.
Income reality check (what the rent is worth)
| Line | Assumption | Output | Investor note |
|---|---|---|---|
| Passing rent used | £14,460 pa (conservative, because tenancy section references it) | £14,460 | If £14,640 is confirmed in the lease, upside is marginal. Focus on lease terms and renewal risk. |
| Yield range used | 6.5% to 7.5% | Indicative | Mixed-use with redevelopment intent and lease uncertainty tends to price wider than clean investment stock. |
| Indicative income value | £14,460 divided by yield | £193,000 to £223,000 | £14,460 / 7.5% = £192,800 and £14,460 / 6.5% = £222,500 (rounded). This is your “income floor”, not the deal thesis. |
If your hammer price is far above the income value range, you are paying for planning uplift and execution.
That is fine only if your costs, timeline, and exit pricing are underwritten conservatively.
Development appraisal (base case, consented scheme only)
- Residential output: 2 units only (upper conversion including loft plus rear 3-storey unit).
- Programme: 18 months all-in (conditions, tender, build, sales).
- Cost posture: London small-site build costs plus buffers for heritage and acoustic compliance.
- Minimum investor-grade margin: 15% of residential GDV.
| Item | Assumption | Base case £ |
|---|---|---|
| Residential GDV (upper conversion) | 1 bed or compact 2 bed resale in Deptford | 425,000 |
| Residential GDV (rear 3-storey unit) | 2 to 3 bed small house or maisonette style | 600,000 |
| Total residential GDV | Base case | 1,025,000 |
| Upper conversion build cost | £1,800 per sq m x 55 sq m | 100,000 |
| Rear build cost | £2,200 per sq m x 95 sq m | 210,000 |
| Enabling and external works | Utilities, drainage, servicing, access, demolition allowance | 35,000 |
| Heritage and frontage allowance | Shopfront, façade approach, roof touch-ups if required | 35,000 |
| Professional fees | Architect, structural, M&E, acoustics, planning discharge, building control, party wall | 75,000 |
| Surveys and condition discharge | Archaeology WSI, reports, testing, approvals | 18,000 |
| Contingency | 10% of core build lines | 38,000 |
| Finance and holding (development period) | Interest, fees, and buffers across the programme | 65,000 |
| Sales and conveyancing | Agency, marketing, legal fees | 30,000 |
| Total development cost (excluding purchase) | Base case | 606,000 |
| Minimum developer margin (15%) | 15% of £1,025,000 | 154,000 |
| Residential residual available for purchase and acquisition | £1,025,000 minus £606,000 minus £154,000 | 265,000 |
The residential residual above is the uplift created by the consent after paying costs and a minimum margin.
Your realistic maximum bid is formed by combining this residual with the commercial income value, then subtracting acquisition costs.
Finance reality check (what lenders will do to your plan)
- Bridging is common: standard term debt is not always available while conditions are outstanding or works are active.
- Mixed-use reduces leverage: LTV can be capped lower than residential-only deals.
- Exit is not automatic: keeping the commercial unit can push you into specialist refinance routes with conservative valuations.
- Programme drift costs real money: extra months can quickly erase margin via interest and prelims.
| Stress | What it does | Typical impact range | How to defend |
|---|---|---|---|
| +3 months programme | More interest plus contractor prelims and slippage costs | £20,000 to £40,000 | Bid with buffer and sequence condition discharge early to avoid dead time. |
| +10% build inflation | Cost rises on core build and compliance items | £30,000 to £60,000 | Tender properly, lock scope, ringfence a separate pot for frontage and acoustic compliance. |
| GDV -5% | Lower sale prices compress margin fast on small schemes | About £51,000 off GDV | Underwrite to conservative pricing and treat best-case comparables as upside only. |
Planning downside stress test (where this breaks)
| Downside | Trigger | Why it matters | Mitigation |
|---|---|---|---|
| Heritage scope expansion | Shopfront and façade works require more restoration than budgeted | Extra cost plus slower approvals | Get a shopfront and façade contractor budget early and keep a ringfenced contingency pot. |
| Acoustic compliance rework | Post-completion testing fails | Rework plus time blowout | Use an acoustic consultant early and avoid value engineering that risks failure. |
| Archaeology delay | WSI triggers additional investigation during enabling or foundations | Small sites cannot absorb prelims easily | Programme for it and treat it as a genuine timeline risk, not a footnote. |
| Rear servicing and access friction | Refuse, cycle storage, plant location, and rear access constraints force redesign | Efficiency loss can reduce appeal and GDV | Confirm title rights and practical servicing routes before you assume a clean build. |
| Commercial disruption | Works affect trading and access | Rent concessions or delays can appear | Check lease rights and redevelopment clauses and plan phasing in writing. |
Maximum bid analysis (4 scenarios, SDLT corrected)
SDLT estimates below use the UK non-residential and mixed rates: 0% up to £150,000, 2% on the next £100,000 (to £250,000), and 5% on the remainder.
Always confirm SDLT with your solicitor or accountant.
| Bid scenario | Hammer price | Indicative SDLT | Buyer admin fee | Other acquisition costs (allowance) | All-in purchase estimate | UncommonDeal take |
|---|---|---|---|---|---|---|
| Scenario 1 (guide +10%) | £357,500 | £7,375 | £1,800 | £12,000 | £378,675 | Strong starting position. Leaves room for delays and condition-driven costs. |
| Scenario 2 (value buy) | £400,000 | £9,500 | £1,800 | £12,000 | £423,300 | Solid entry price. Still comfortable if build costs drift. |
| Scenario 3 (competitive) | £475,000 | £13,250 | £1,800 | £12,000 | £502,050 | Workable if programme discipline is strong and you underwrite conservative GDV. |
| Scenario 4 (ceiling) | £520,000 | £15,500 | £1,800 | £12,000 | £549,300 | Top end. Above this, the scheme becomes highly sensitive to delays and cost drift. |
Walk away if the hammer goes above £520,000.
At that point, you are effectively close to £550,000 all-in once SDLT, admin charge, and basic acquisition costs are included.
Above the ceiling, the deal relies on near-perfect delivery to protect a minimum investor-grade margin.
What would change the bid (before you commit)
- Lease and renewal risk: confirm term, breaks, repair obligations, redevelopment clauses, arrears, and any rent concessions implied by the tenant wanting a smaller area.
- Title and rear rights: rights of way, service routes, access, and any restrictions that impact the rear build and plant.
- S106 and CIL: confirm triggers, payments, and any monitoring fees, then treat them as real cash costs.
- Condition discharge sequencing: confirm what must be signed off before starting works to avoid idle time and interest burn.
- Commercial disruption: confirm the phasing plan can preserve income or quantify the cost of disruption in advance.
This section shows the project profit or loss under four hammer-price scenarios, using a base case and two downside stress tests.
Figures are estimates for decision support only.
- Residential GDV (base case): £1,025,000 (upper unit £425k + rear unit £600k)
- Commercial value at exit (indicative): £207,000 (rent £14,460 divided by 7.0% yield)
- Total development costs (excluding purchase): £606,000
- Downside 1 (market softens): Residential GDV reduced by 5%
- Downside 2 (cost and time hit): Development costs increased by 10% plus £25,000 extra finance/time buffer
Note: The commercial “value at exit” is included to reflect the retained asset value. If you plan to sell commercial separately, adjust yield and sales costs.
| Scenario | All-in purchase estimate | Total project cost (purchase + dev) | Total value at exit (base) | Profit (base) | Profit (Downside 1: GDV -5%) | Profit (Downside 2: costs +10% and time buffer) | ROI on total cost (base) |
|---|---|---|---|---|---|---|---|
| Scenario 1 (guide +10%) | £378,675 | £984,675 | £1,232,000 | £247,325 | £196,075 | £161,725 | 25.1% |
| Scenario 2 (value buy) | £423,300 | £1,029,300 | £1,232,000 | £202,700 | £151,450 | £117,100 | 19.7% |
| Scenario 3 (competitive) | £502,050 | £1,108,050 | £1,232,000 | £123,950 | £72,700 | £38,350 | 11.2% |
| Scenario 4 (ceiling) | £549,300 | £1,155,300 | £1,232,000 | £76,700 | £25,450 | -£8,900 | 6.6% |
The ceiling scenario becomes fragile. Under a realistic cost and time hit (Downside 2), profit turns negative.
That is why the hard walk-away is set at the ceiling hammer price.
Bottom line
This is a legitimate planning-led mixed-use opportunity in Deptford where the main value driver is the consented residential uplift, not the passing rent.
The deal works when you buy it with discipline, value the scheme as two consented units only, and maintain buffers for condition-driven costs and programme drift.
If bidding runs beyond the ceiling, the risk-adjusted margin compresses quickly and walking away is the investor move.
Disclaimer: Decision support only, not legal/financial advice. Buyers should view the property and ensure they are satisfied with the structure and condition before bidding.
Always have your solicitor confirm covenants, auction conditions, and any special conditions before bidding.
Sources:
Auction House London lot page,
UK Gov SDLT mixed-use rates.
Legal Pack Analysed (Investor Preview)
This is not a summary.
This is a buyer-grade legal risk review.
Every auction and sourced deal comes with a legal pack.
Most investors either skim it… or ignore it entirely.
That’s where expensive mistakes happen.
Below analysis breaks down the actual risks, restrictions, and hidden clauses inside the legal pack that directly affect:
- Whether you can finance the deal
- Whether your exit works
- Whether the numbers you ran are even valid
Legal Pack Review (Planning, Heritage, EPC, Drawings)
Planning conditions heavy
Pre-auction checks required
This is not a complete auction legal pack (for example: title register/plan, special conditions of sale, leases/tenancies, searches, replies, etc. are not included here).
Treat this as a planning and development constraints review and verify the missing legal documents with the auctioneer/solicitor before bidding.
Clickable contents
1) Documents reviewed (labelled)
| Section | Document | What it is | Why it matters to bidders |
|---|---|---|---|
| Planning permission | Lewisham Decision Notice: DC/25/139285 :contentReference[oaicite:0]{index=0} | Formal planning approval with conditions and informatives. | Conditions create cost, programme risk, and sign-off dependencies before occupation. |
| Approved drawings | Approved Plans (UPP / Danshe Limited) dated 26.05.2025 :contentReference[oaicite:1]{index=1} | Approved scheme visuals, plans, elevations and sections supporting the permission. | Confirms what is permitted (and what is not). Used for BC, tendering, and compliance. |
| Existing drawings | Existing plans set (UPP / Danshe Limited) dated 08.10.2024 :contentReference[oaicite:2]{index=2} | Existing layout and sections, useful for baseline constraints. | Helps spot structural/extents, what is being altered, and likely scope. |
| Earlier proposed scheme | Proposed (Pre-application) dated 08.10.2024 :contentReference[oaicite:3]{index=3} | Earlier concept scheme with different unit schedule. | Risk of confusion if marketing refers to older drawings. Verify the final approved set. |
| Heritage support | Cambridge Heritage letter (June 9th, 2025) :contentReference[oaicite:4]{index=4} | Design response in/near conservation area, front restoration focus. | Signals heritage-led requirements (shopfront, sash windows, paint removal, lime mortar, dormer restoration). |
| Energy | EPC (Ground Floor and Basement) rating B, valid to 20 Dec 2033 :contentReference[oaicite:5]{index=5} | Commercial EPC for ground/basement use. | Useful for commercial letting and lender comfort; does not confirm residential EPC position. |
2) Planning permission summary (Lewisham DC/25/139285)
- Conversion of first floor and loft space at 32 Deptford High Street.
- Front elevation changes including two windows to first floor front.
- Rear roof dormer (rear roof slope).
- Construction of a three-storey building facing Reginald Square to provide 2 self-contained residential units.
- Private external amenity, refuse and cycle storage, air source heat pumps, associated works.
- Subject to a Unilateral Undertaking (S106) dated 27 Oct 2025.
This permission is deliverable, but condition-heavy.
Expect additional reports, approvals, samples, and verification sign-offs before occupation.
Budget for professional fees and programme time.
2.1 Conditions that matter most to investors
| Condition | Trigger | What it requires | Investor impact | Risk flag |
|---|---|---|---|---|
| Approved plans | Always | Build must match the listed drawings/documents (multiple drawing sets received 24 Mar 2025 and 12 Jun 2025). | Any deviations can require amendments or new consent. | Check |
| External sound insulation | Before external envelope works + pre-occupation testing | Scheme to meet internal noise levels (35 dB LAeq day, 30 dB LAeq night bedrooms) with windows closed, and testing report before occupation. | Cost uplift for acoustic glazing/ventilation; sign-off dependency to occupy. | Cost + delay |
| Materials/details | Before above-ground works | Submit and approve brickwork/mortar sample panel, roof covering, window/door details (including sash), copings, rainwater goods, fascia/soffits/eaves, shopfront specs and drawings. | Procurement risk and heritage sensitivity; wrong choices can be rejected. | Quality risk |
| Refuse storage | Before first occupation | Provide refuse storage for residential and commercial as shown on drawing 032DE-A-03-101 (received 12 Jun 2025). | Must be delivered or occupation can be blocked. | Manageable |
| Cycle parking | Before first occupation | Provide long-stay residential cycle parking as per approved drawings. | Space planning requirement. | Manageable |
| Archaeology WSI | Before any development starts | Stage 1 Written Scheme of Investigation; if finds occur, Stage 2 WSI and post-investigation outputs, potentially pre-occupation requirements. | Programme risk, enabling works risk, extra cost. | High risk |
| NRMM emissions | During demo and construction | Plant must meet GLA SPG emissions standards; maintain online register record. | Contractor compliance requirement. | Manageable |
| Air quality neutral | If gas boilers proposed | Boilers must have NOx emissions not exceeding 40 mg/kWh (if used). | May steer you away from gas, or require compliant kit. | Design constraint |
| Heritage Restoration Plan | Before any development starts + pre-occupation verification | Submit and approve full details of heritage enhancements, including: sash windows, historically accurate shopfront and removal of adverts, paint removal and brick cleaning/repointing, and roof restoration. Must be completed before residential occupation with verification report. | Front elevation works become a gating item. Specialist joinery and lime mortar likely required. | High risk |
| Air source heat pump | Before first occupation | Submit details including noise and attenuation; rating level to be 5 dB below background, assessed to BS4142:2019; install attenuation before operation. | Design and neighbour-amenity risk; can cause redesign or extra attenuation cost. | Neighbour risk |
3) Red flags and pre-auction checks (must-do)
| Red flag | What in the documents triggers it | Why it matters | What to verify before bidding |
|---|---|---|---|
| Unilateral Undertaking (S106) exists but not included | Decision notice states S106 Unilateral Undertaking dated 27 Oct 2025. :contentReference[oaicite:11]{index=11} | Could include financial contributions, restrictions, compliance steps, or monitoring fees. | Obtain and read the undertaking in full. Confirm any payments, triggers, indexation, and whether it binds successors. |
| Archaeology WSI before commencement | Condition requires Stage 1 WSI and possibly Stage 2 if archaeology found. :contentReference[oaicite:12]{index=12} | Can delay start on site, increase prelims, and add specialist fees. | Ask planning consultant/archaeologist for likely scope in this location and time allowance. Price it into programme. |
| Heritage Restoration Plan is a gating item | Condition 10 requires detailed heritage plan and completion before occupation. :contentReference[oaicite:13]{index=13} | Specialist joinery/shopfront and masonry methods (paint removal, lime mortar) can be expensive and slow. | Confirm conservation area constraints, expected specs, and whether there are existing adverts/signage to remove. Get budget quotes early. |
| Noise and ASHP compliance risks | Acoustic internal targets + ASHP noise rating 5 dB below background (BS4142). :contentReference[oaicite:14]{index=14} :contentReference[oaicite:15]{index=15} | Can force acoustic glazing, sealed windows, mechanical ventilation, or relocation/attenuation of plant. | Desktop noise review of the street context and nearest receptors. Confirm feasible plant position from drawings and budget for attenuation. |
| Possible confusion between “Approved” and older “Proposed” drawings | The pre-application proposed set shows a different schedule (3 units and larger areas), while decision notice is for 2 residential units. :contentReference[oaicite:16]{index=16} :contentReference[oaicite:17]{index=17} | Misreading the scheme can break your appraisal (unit count, GIA, amenity, commercial size). | Ensure the auction listing references the DC/25/139285 approved set and confirm the unit schedule you are buying into. |
| CIL exposure | Informatives confirm CIL liable. :contentReference[oaicite:18]{index=18} | Cashflow impact at commencement, penalties if paperwork is wrong. | Ask for CIL liability estimate. Confirm if any relief is possible and what forms must be filed before start. |
4) Design and unit schedule (what the drawings indicate)
Use it only as background context, not for your appraisal. :contentReference[oaicite:20]{index=20}
4.1 What the “Approved Plans” drawings show (headline)
| Item | What the drawings show | Investor note |
|---|---|---|
| Site | 32 Deptford High Street, SE8 4AF (UPP / Danshe Limited), issue date 26.05.2025. :contentReference[oaicite:21]{index=21} | Matches the address in the decision notice. |
| Proposed GIA schedule (shown on drawings) | Class E: 102.24 m²; Storage: 31.17 m²; Unit 01: 47.47 m² (1b2p); Unit 02: 79.44 m² (2b3p); Total: 260.32 m². :contentReference[oaicite:22]{index=22} | Use this as the base schedule for appraisal, unless the auction listing states otherwise. |
| Front elevation restoration intent | Notes include new timber-framed sliding sash windows, traditional timber shopfront, brick cleaning and lime mortar repointing, dormer repairs. :contentReference[oaicite:23]{index=23} | Aligns with the Heritage Restoration Plan condition, but still requires approval of detailed specs before start. |
4.2 What the older pre-application proposed set indicates (do not appraise from this)
| Drawing set | Schedule shown | Why it matters | Risk |
|---|---|---|---|
| Pre-application proposed (08.10.2024) :contentReference[oaicite:24]{index=24} | Bikes 9.94 m²; Bins 5.62 m²; Commercial 86.45 m²; Unit 01 58.52 m²; Unit 02 58.34 m²; Unit 03 95.45 m²; Total 314.33 m². :contentReference[oaicite:25]{index=25} | This appears to be an earlier or alternative layout and may not match the approved scheme described in the decision notice (2 units). | High |
the approved permission DC/25/139285 and the correct drawing set (received 12 June 2025 in the decision notice). :contentReference[oaicite:26]{index=26}
5) Heritage and conservation area implications
- Site sits within the Deptford High Street and St Paul’s Church Conservation Area context.
- Front elevation works emphasise reinstating appropriate timber sash windows, a traditional timber shopfront, removal of modern fascia, roof dormer restoration, and brickwork works including lime mortar repointing.
- Rear massing revised to respond to council concerns; heritage value is argued to be concentrated on the front elevation.
- States building is not statutorily listed (but still sensitive due to conservation setting).
Even without listing, the permission is effectively “heritage conditioned”.
Your contractor package should assume conservation-grade joinery and masonry methods,
plus additional approvals before above-ground works and before occupation. :contentReference[oaicite:28]{index=28}
6) EPC summary (commercial element)
| Property covered | Ground Floor and Basement, 32 Deptford High Street, SE8 4AF. :contentReference[oaicite:29]{index=29} |
| EPC rating | B (score 49), valid until 20 December 2033. :contentReference[oaicite:30]{index=30} |
| Property type on EPC | Restaurants and Cafes / Drinking Establishments / Takeaways. :contentReference[oaicite:31]{index=31} |
| Total floor area (EPC) | 153 square metres. :contentReference[oaicite:32]{index=32} |
| Investor note | Strong commercial EPC position (EPC B). However, this EPC does not confirm the residential EPC outcome for the new units. If your exit relies on sales or lettings, budget for residential EPC assessments at completion. |
7) Action list before the auction (practical)
- Get the missing auction legal pack documents: title register/plan, special conditions, leases/tenancies, searches, CPSE replies, indemnities, planning agreement copies, etc.
- Obtain and review the S106 Unilateral Undertaking dated 27 Oct 2025, confirm all obligations and any payments. :contentReference[oaicite:33]{index=33}
- Confirm the correct approved drawing set (the decision notice lists drawings received 24 Mar 2025 and 12 Jun 2025). Ask the auctioneer which set the lot is being sold on. :contentReference[oaicite:34]{index=34}
- Run a planning compliance plan: map each condition to a deliverable, estimated cost, lead times, and trigger (pre-commencement vs pre-occupation). :contentReference[oaicite:35]{index=35}
- Archaeology risk call: speak to an archaeologist or planning consultant about likely WSI scope and contingency. :contentReference[oaicite:36]{index=36}
- Heritage cost check: obtain budget quotes for shopfront, sash windows, paint removal, lime mortar repointing, and roof works. :contentReference[oaicite:37]{index=37}
- Acoustics and ASHP review: confirm feasibility and likely spec for acoustic ventilation and ASHP noise attenuation. :contentReference[oaicite:38]{index=38}
- CIL clarification: ask for the CIL liability estimate and confirm forms/relief steps before commencement. :contentReference[oaicite:39]{index=39}
Provide lenders with the decision notice, the condition schedule, and your condition-discharge plan.
The two biggest lender questions here are usually: (1) pre-commencement conditions (archaeology, heritage plan details), and (2) occupation blockers (heritage completion verification, acoustics testing, ASHP noise sign-off).
8) Disclaimer
This report is provided for general information only and does not constitute legal advice, planning advice, valuation advice, or investment advice.
You should instruct a suitably qualified solicitor and relevant professionals (planning consultant, surveyor, architect, acoustic consultant, and contractor) to verify all matters before bidding.
No liability is accepted for decisions made based on this summary.
Analysis date: 17 February 2026. Legal packs and planning pages can be updated by the auctioneer at any time.
Viewers should check the auctioneer website for amendments, addenda, or updated documents before the auction date and before exchange/completion.
Investment Financials
Detailed figures supplied by the deal source. Use these figures as a starting point for your own investment analysis.
Acquisition & Project Costs
Projected Outcome
Financial information is supplied by the listing source and may not include all purchase, finance, tax, legal, holding, refurbishment or disposal costs. Investors should independently verify all figures and assumptions before proceeding.
Analyse This Deal Yourself
The figures above are provided by the listing source. Use one of our calculators below to test the assumptions using your own costs, finance terms and investment criteria.
Property Deal Stack-Up Calculator
Compare how this property may perform as a Flip, Buy-to-Let or BRRR investment using your own assumptions.
After submitting your figures, UncommonDeal will create a personalised comparison of the Flip, Buy-to-Let and BRRR strategies using the assumptions you entered.
UK Auction Property ROI Calculator
Test an auction property using your own purchase, refurbishment, finance, resale and rental assumptions.
Investment Assessment
Ready to Analyse Your Deal?
Enter your assumptions above, then analyse the deal to receive an instant investment assessment including projected profit, ROI, rental yield and overall deal quality.
Live Auction Deal Assessment
Auction Investment Assessment
Your live auction deal verdict, investment score and key findings will update using the figures entered above.
Our Assessment
Enter your assumptions above and click Analyse Your Deal to generate an investment assessment.
Key Findings
Recommended Next Steps
Important Due Diligence Notice
Property investment opportunities listed on UncommonDeal are provided by independent deal sources, advertisers and other third-party property professionals. Unless expressly stated otherwise, UncommonDeal does not independently verify every detail, financial figure or investment assumption contained within a listing.
Before making any investment decision, you should carry out your own independent due diligence and verify all relevant information, including the property condition, purchase price, comparable values, rental estimates, refurbishment costs, planning matters, legal title, financing assumptions, taxes, fees and projected returns.
Property investment involves risk. Figures and projections shown within a listing are estimates only and should not be treated as guarantees of future performance or returns.
We write rarely, but only the best content.
Please check your email for a confirmation email.
Only once you've confirmed your email will you be subscribed to our newsletter.